Laserfiche WebLink
Does the Project result in 2,000 square feet, or more, of new plus replaced hard surface area? <br /> OR <br /> Does the land disturbing activity total 7,000 square feet or greater? <br /> Yes No <br /> Minimum Requirements#1 through#5 <br /> apply to the new and replaced hard Minimum Requirement#2 applies. <br /> surfaces and the land disturbed. <br /> Next Question <br /> Does the Project add 5,000 square feet or more of new hard surfaces? <br /> OR <br /> Convert Y4 acres or more of vegetation to lawn or landscaped areas? <br /> OR <br /> Convert 2.5 acres or more of native vegetation to pasture? <br /> Yes No <br /> All Minimum Requirements apply Next Question <br /> to the new hard surfaces and the Is this a road <br /> related project? NO <br /> converted vegetation areas. <br /> Yes <br /> Does the Project add 5,000 square feet or more of new hard surfaces? <br /> Yes NO Is the total of new plus replaced hard surfaces 5,000 <br /> square feet or more, <br /> Do the new hard IF AND <br /> surfaces add 50%or does the value of the proposed improvements- <br /> No No additional No including interior improvements-exceed 50%of the <br /> more to the existing No assessed value or replacement value of the: <br /> hard surfaces within requirements. { p ) <br /> the Site? • existing Project Site improvements(for <br /> commercial or industrial projects)OR <br /> • existing Site improvements(for all other projects) <br /> Yes All Minimum Requirements apply to the new and replaced <br /> hard surfaces and converted vegetation areas. Yes <br /> Flow Chart for Determining Requirements for <br /> Redevelopment <br /> Revised March 2019 <br /> DEPARTMENT OFF <br /> ECOLOGY Please see http://www.ecy.wa.gov/copynght.html for copyright notice including permissions, <br /> State of Washington limitation of liability,and disclaimer. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan/Report—Sept.2023 Page 5 of 40 <br />