My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6133 LAKE CHAPLAIN RD 2025-08-19
>
Address Records
>
LAKE CHAPLAIN RD
>
6133
>
6133 LAKE CHAPLAIN RD 2025-08-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 3:23:16 PM
Creation date
7/28/2025 11:34:33 AM
Metadata
Fields
Template:
Address Document
Street Name
LAKE CHAPLAIN RD
Street Number
6133
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The minimum technical requirements for a small project (MR#1-5) are as follows: <br /> ■ MR#1: Preparation of a Stormwater Site Plan(Report and Plans) <br /> ■ MR#2: Construction Stormwater Pollution Prevention Plan(SWPPP) <br /> ■ MR#3: Source Control of Pollution <br /> ■ MR#4: Preservation of Natural Drainage Systems and Outfalls <br /> ■ MR#5: On-Site Stormwater Management <br /> 0) The next section of this template (Section 3)will step you through the minimum requirements <br /> for compliance with the Stormwater Code. Continue to get started! <br /> SECTION 3. COMPLETE MINIMUM REQUIREMENTS #1-5 <br /> The following subsections address MR#1-5.The more information provided in these subsections typically <br /> corresponds to faster review and approval, leading to permit issuance. Submitted Small Project Stormwater <br /> Site Plan/Report templates that lack the necessary information for review are considered incomplete and <br /> will be returned unprocessed to the applicant. <br /> MR #1: Preparation of Stormwater Site Plan <br /> The purpose of MR#1 is to convey all relevant information about the proposed project to the City for <br /> review to ensure that it complies with the current City and State stormwater management standards.This <br /> is your opportunity to inform the reviewer about your project and define the proposed approach for <br /> stormwater management.This completed template and required attachments (see Steps 1.3 through 1.6) <br /> serves as your Stormwater Site Plan. <br /> Step 1.1: Identify the existing site conditions. <br /> List all existing roof surfaces and their approximate area fft2). <br /> Roof type Present at this site?(Yes/No) Approximate area (ft2) <br /> House:SFR, multi family ❑Yes 0 No <br /> Garage ❑Yes 0 No <br /> Shed ❑Yes 0 No <br /> Building: commercial, industrial ❑Yes 0 No <br /> Other: ❑Yes El No <br /> List all existing non-roof hard surfaces at ground level and their approximate area fft2). <br /> Non-roof hard surface type Present at this site?(Yes/No) Approximate area (ft2) <br /> Patio ❑Yes 0 No <br /> Driveway ❑Yes 0 No <br /> Sidewalk ❑Yes 0 No <br /> Parking ❑Yes 0 No <br /> Other: ❑Yes 0 No <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan/Report—Sept.2023 Page 6 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.