Laserfiche WebLink
I <br /> I <br /> ITable of Contents <br /> I. Project Description 1 <br /> 1 II. Site Assessment 3 <br /> III. Site Development Plan w/On-Site Stormwater Management 4 <br /> ITask 1: Determining Minimum Requirements 4 <br /> Task 2: Governing Guidelines 7 <br /> Task 3: Design Criteria 7 <br /> IIV. Construction Stormwater Pollution Prevention Plan 9 <br /> V. Source Control Plan 10 <br /> IVI. Special Reports and/or Studies 13 <br /> VII.Other Permits 15 <br /> IVIII. Permanent Stormwater Control Plan 16 <br /> A. Offsite Analysis 16 <br /> I B. Pre-Developed Site Hydrology 16 <br /> C. Developed Site Hydrology 16 <br /> D. Stormwater Flow Control Plan 17 <br /> I E. Stormwater Treatment Plan 17 <br /> F. Operations and Maintenance Plan 18 <br /> I <br /> Table of Figures <br /> IFigure 1—Vicinity Map 2 <br /> Figure 2 -Flow Chart for Determining Requirements for New Development and <br /> 1 Redevelopment 5 <br /> Figure 3 -Flow Chart for Determining Additional Requirements for Redevelopment 6 <br /> Figure 4—Activity Worksheet(2010 City of Everett Stormwater Management Manual)...11 <br /> 1 List of Appendices <br /> I Appendix A—NRCS Soil Map <br /> Appendix B—Improvement Plans <br /> Appendix C—Quality Design(WWHM3 Calcs & Contech Sizing) <br /> IAppendix D—Operations and Maintenance Manual <br /> I <br /> I Stormwater Site Plan Page i <br /> McClean Ironworks Site Improvements August 2014 <br /> I <br />