My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2102 ROSS AVE 2025-07-28
>
Address Records
>
ROSS AVE
>
2102
>
2102 ROSS AVE 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 11:38:44 AM
Creation date
7/28/2025 11:37:45 AM
Metadata
Fields
Template:
Address Document
Street Name
ROSS AVE
Street Number
2102
Notes
STORMWATER SITE ADDENDUM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I <br /> Project Description <br /> This Stormwater Site Plan Addendum Report addresses applicable stormwater <br /> requirements for the proposed non-ferrous fabricating shop, office building, and barge <br /> transportation facility consisting of a crane pad and dock at McClean Ironworks. A <br /> stormwater site plan has already been prepared for the existing steel fabricating shop on <br /> the main site within tax parcel#29050900200400. <br /> The proposed improvements are within a larger common development plan for McClean <br /> Ironworks and located on Smith Island within tax parcel#29050800101100 and <br /> 29050900200400 along the northern shoreline of the Snohomish River at approximate <br /> River Mile 1.5 immediately east of State Route 529 within the City of Everett, <br /> Washington. The site is bounded on the south by the Snohomish River, on the north by <br /> Ross Avenue,the west by an aggregate yard owned by Glacier NW(parcel <br /> #29050800100200) and east by a sawmill chip storage facility(parcel #29050900200800) <br /> owned by Dunlap Towing. The project lies within the northeast quarter of Section 8 and <br /> northwest quarter of Section 9, Township 29 N., Range 5 E., W.M.. <br /> McClean Ironworks is proposing a new fabricating shop for non-ferrous metals <br /> (aluminum,titanium, etc...)and an office building adjacent to the shop encompassing a <br /> gross building area of 12,750 square feet. In addition, a wharf or barge transportation <br /> facility consisting of a crane pad and dock along the Snohomish River is being proposed <br /> in the southeast corner of the project site to serve the existing steel fabrication facility. <br /> Mitigation is also required by the Corps and WDFW to compensate for potential wharf- <br /> related impacts to existing estuarine habitat associated with shading. <br /> The two proposed work areas encompass approximately 1.95 acres. Construction <br /> activities will include re-grading and importing fill for the non-ferrous fabricating shop, <br /> driving 18" diameter galvanized steel pipe piles for the wharf, staging area construction <br /> including excavation, framing, and pouring concrete, asphalt paving, drainage system <br /> installation, as well as general construction of the shop, office, and barge facility. <br /> The zoning for the project site is Heavy Manufacturing(M-2). According to the Natural <br /> Resources Conservation Service (NRCS), the soils on the project site primarily consist of <br /> Urban land. See Appendix A for a NRCS Soil Map. <br /> The proposed stormwater facilities will comply with the 2012 Department of Ecology <br /> Stormwater Management Manual for Western Washington(DOE Manual), the 2010 City <br /> of Everett Stormwater Management Manual and the City of Everett Design and <br /> Construction Standards and Specifications (November 2011). <br /> I <br /> Stormwater Site Plan Page 1 <br /> McClean Ironworks Site Improvements August 2014 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.