Laserfiche WebLink
I <br /> Sediment removal and cartridge replacement on an as needed 7. Remove safety equipment. <br /> I <br /> basis is recommended unless site conditions warrant. 8. If appropriate, make notes about the local drainage area <br /> Once an understanding of site characteristics has been relative to ongoing construction, erosion problems, or high <br /> established, maintenance may not be needed for one to three loading of other materials to the system. <br /> ' years, but inspection is warranted and recommended annually. 9.Discuss conditions that suggest maintenance and make <br /> decision as to weather or not maintenance is needed. <br /> Inspection Procedures Maintenance Decision Tree <br /> ' The primary goal of an inspection is to assess the condition of The need for maintenance is typically based on results of the <br /> the cartridges relative to the level of visual sediment loading as inspection. The following Maintenance Decision Tree should be used as <br /> it relates to decreased treatment capacity. It may be desirable to a general guide. (Other factors,such as Regulatory Requirements,may <br /> conduct this inspection during a storm to observe the relative need to be considered) <br /> ' flow through the filter cartridges. If the submerged cartridges <br /> are severely plugged,then typically large amounts of sediments "" liF i <br /> will be present and very little flow will be discharged from the i ' . „? 1..._ ,, N ,;'- <br /> I <br /> drainage pipes. If this is the case,then maintenance is warranted „ <br /> and the cartridges need to be replaced. . <br /> Warning: In the case of a spill, the worker should abort - <br /> ' inspection activities until the proper guidance is obtained. <br /> Notify the local hazard control agency and CONTECH I <br /> Construction Products immediately. <br /> To conduct an inspection: : ' <br /> Important: Inspection should be performed by a person who <br /> is familiar with the operation and configuration of the Ilitt, - ,4#' <br /> I Storm Filter treatment unit. <br /> 1.If applicable, set up safety equipment to protect and notify , <br /> surrounding vehicle and pedestrian traffic. <br /> ' 2.Visually inspect the external condition of the unit and take notes concerning defects/problems. 1.Sediment loading on the vault floor. <br /> a. If>4"of accumulated sediment, maintenance is <br /> required. <br /> ,+�, r a,. t r . 2.Sediment loading on top of the cartridge. <br /> f �' a. If>1/4"of accumulation, maintenance is required. <br /> t 4 <br /> I ''" .cC 4r rr- 3.Submerged cartridges. <br /> � t 7 . l: a. If>4"of static water in the cartridge bay for more <br /> _ that 24 hours after end of rain event, maintenance is <br /> y <br /> ' ,4nt she a� , required. <br /> 4. Plugged media. <br /> a. If pore space between media granules is absent, <br /> - t maintenance is required. <br /> 5.Bypass condition. <br /> a. If inspection is conducted during an average rain fall <br /> I <br /> •. event and StormFilter remains in bypass condition <br /> (water over the internal outlet baffle wall or submerged <br /> w; i cartridges), maintenance is required. <br /> .r" <br /> I <br /> 3.Open the access portals to the vault and allow the system vent. 6.Hazardous material release. <br /> 4.Without entering the vault,visually inspect the inside of the a. If hazardous material release(automotive fluids or other) <br /> unit,and note accumulations of liquids and solids. is reported, maintenance is required. <br /> 1 <br /> 5.Be sure to record the level of sediment build-up on the floor of 7. Pronounced scum line. <br /> the vault, in the forebay,and on top of the cartridges. If flow a. If pronounced scum line(say>_ 1/4"thick) is present <br /> is occurring, note the flow of water per drainage pipe. Record above top cap, maintenance is required. <br /> I <br /> all observations. Digital pictures are valuable for historical <br /> documentation. 8.Calendar Lifecycle. <br /> 6.Close and fasten the access portals. a. If system has not been maintained for 3 years <br /> maintenance is required. <br /> 1 3 <br />