Laserfiche WebLink
I <br /> Assumptions111 <br /> • No rainfall for 24 hours or more ,� <br /> " l <br /> • No upstream detention (at least not draining into StormFilter) 10_;;;4 r <br /> • Structure is online — `�r - <br /> I <br /> • Outlet pipe is clear of obstruction <br /> • Construction bypass is plugged t <br /> Maintenance <br /> Depending on the configuration of the particular system, k_ <br /> maintenance personnel will be required to enter the vault to , <br /> perform the maintenance. " �tC <br /> I <br /> Important: If vault entry is required, OSHA rules for confined 17:li <br /> fspace entry must be followed. <br /> IFilter cartridge replacement should occur during dry weather. ALIt may be necessary to plug the filter inlet pipe if base flows is x'occurrinpiii �� r �,:,9 ,1 Replacement cartridges can be delivered to the site or customers ,�facility. Information concerning how to obtain the replacement ,cartridges is available from CONTECH Construction Products. �` �t t <br /> ._},�,..�_��� •�•d yam'. _ _ <br /> Warning: In the case of a spill, the maintenance personnel F <br /> should abort maintenance activities until the proper <br /> guidance is obtained. Notify the local hazard control <br /> I agency and CONTECH Construction Products immediately. <br /> r� <br /> To conduct cartridge replacement and sediment removal / <br /> maintenance: Important: Note that cartridges containing leaf media (CSF)do <br /> I 1.If applicable, set up safety equipment to protect maintenance not require unscrewing from their connectors.Take care <br /> personnel and pedestrians from site hazards. not to damage the manifold connectors.This connector <br /> 2.Visually inspect the external condition of the unit and take should remain installed in the manifold and could be <br /> I <br /> notes concerning defects/problems. <br /> 3.Open the doors(access portals)to the vault and allow the capped during the maintenance activity to prevent <br /> sediments from entering the underdrain manifold. <br /> system to vent. B. Remove the used cartridges(up to 250 lbs.each)from the <br /> I 4.Without entering the vault,give the inside of the unit, vault. <br /> including components,a general condition inspection. Important: Care must be used to avoid damaging the <br /> 5.Make notes about the external and internal condition of cartridges during removal and installation.The cost of <br /> 111 <br /> the vault.Give particular attention to recording the level of repairing components damaged during maintenance <br /> sediment build-up on the floor of the vault, in the forebay, will be the responsibility of the owner unless CONTECH <br /> and on top of the internal components. Construction Products performs the maintenance activities <br /> I 6. Using appropriate equipment offload the replacement and damage is not related to discharges to the system. <br /> cartridges(up to 150 lbs.each)and set aside. C. Set the used cartridge aside or load onto the hauling <br /> 7. Remove used cartridges from the vault using one of the truck. <br /> following methods: <br /> I Method 1: D. Continue steps a through c until all cartridges have been <br /> removed. <br /> A. This activity will require that maintenance personnel enter <br /> I the vault to remove the cartridges from the under drain Method 2: <br /> manifold and place them under the vault opening for A. Enter the vault using appropriate confined space <br /> lifting (removal). Unscrew(counterclockwise rotations) protocols. <br /> each filter cartridge from the underdrain connector. B. Unscrew the cartridge cap. <br /> I Roll the loose cartridge,on edge, to a convenient spot <br /> beneath the vault access. C. Remove the cartridge hood screws(3) hood and float. <br /> Using appropriate hoisting equipment, attach a cable D. At location under structure access,tip the cartridge on its <br /> I from the boom,crane, or tripod to the loose cartridge. side. <br /> Contact CONTECH Construction Products for suggested <br /> attachment devices. <br /> 4 <br />