My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2102 ROSS AVE 2025-07-28
>
Address Records
>
ROSS AVE
>
2102
>
2102 ROSS AVE 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 11:38:44 AM
Creation date
7/28/2025 11:37:45 AM
Metadata
Fields
Template:
Address Document
Street Name
ROSS AVE
Street Number
2102
Notes
STORMWATER SITE ADDENDUM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Important: Note that cartridges containing media other than <br /> I the leaf media require unscrewing from their threaded <br /> connectors.Take care not to damage the manifold <br /> connectors.This connector should remain installed in the <br /> manifold and capped if necessary. <br /> ID. Empty the cartridge onto the vault floor. Reassemble the <br /> empty cartridge. <br /> lat <br /> 11W <br /> E. Set the empty, used cartridge aside or load onto the __, '''+� <br /> hauling truck. L_ <br /> F. Continue steps a through e until all cartridges have been ..... _— <br /> Iremoved. <br /> I f <br /> - <br /> _ - ill, ii -- , _. <br /> -a <br /> # Dry .af' NH !� <br /> I \, -4 <br /> r <br /> - :£ gyp, <br /> .. - ` <br /> 8. Remove accumulated sediment from the floor of the <br /> I vault and from the forebay.This can most effectively be <br /> accomplished by use of a vacuum truck. <br /> ,.‘ : . <br /> 9.Once the sediments are removed,assess the condition of the ,,I _ <br /> vault and the condition of the connectors.The connectors • <br /> ' �!"'"""'f�' <br /> are short sections of 2-inch schedule 40 PVC, or threaded ' <br /> schedule 80 PVC that should protrude about 1"above the -� -+ -0.- " " tr" <br /> I floor of the vault. Lightly wash down the vault interior. ; °}' <br /> a. Replace any damaged connectors. <br /> 10. Using the vacuum truck boom,crane,or tripod, lower and <br /> I install the new cartridges. Once again,take care not to <br /> damage connections. <br /> 11.Close and fasten the door. <br /> 12. Remove safety equipment. <br /> 13. Finally, dispose of the accumulated materials in accordance <br /> with applicable regulations. Make arrangements to return the <br /> IIIused empty cartridges to CONTECH Construction Products. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.