Laserfiche WebLink
I <br /> III. Site Development Plan w/On-Site Stormwater <br /> Management <br /> This section provides information on the minimum requirements for a Site Development <br /> Plan and shall utilize On-Site Stormwater Management BMPs to the maximum extent <br /> feasible. The intent of this section is to identify the minimum requirements necessary for <br /> the project and highlight the design criteria that will be utilized to avoid potential <br /> drainage impacts created or exacerbated by the proposed project and drainage facilities. <br /> Task 1: Determining Minimum Requirements <br /> Not all of the Minimum Requirements apply to every development or redevelopment <br /> project. The applicability varies depending on the type and size of the project. This <br /> section identifies thresholds that determine the applicability of the Minimum <br /> Requirements to different projects. The two flow charts below identify the applicable <br /> requirements. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Stormwater Site Plan Page 4 <br /> McClean Ironworks Site Improvements August 2014 <br /> I <br />