Laserfiche WebLink
I <br /> I <br /> I Figure 2 -Flow Chart for Determining Requirements for New Development and <br /> Redevelopment <br /> I <br /> IStart Here <br /> Does the project have <br /> I <br /> 5,000 square feet or <br /> more of new,replaced, it gee AiNnimum Requirement#6 <br /> or new plus replaced <br /> pollutant generating <br /> impervious surface? <br /> No Next Question <br /> - Does the project <br /> convert 314 acres or Does the project have <br /> Does the project add more of native 2,000 square feet or <br /> 5,040 square feet vegetation to lawn or more of new, <br /> or more of new w scaped -� replaced,or new plus <br /> impervious surfaces? land areas,oT <br /> Rmpe No convert 2.5 acres or No replaced impervious <br /> I more of native surfaces? <br /> vegetation to pasture? <br /> I 41 10 Yes Yes No <br /> Does the project <br /> See Minimum See Minimum have land- <br /> Requirements#1 Requirements#1 a disturbing <br /> through#9 through#5 activities of 7,000 <br /> Yes square feet or <br /> more? <br /> I No <br /> s <br /> I See Minimum <br /> Requirement#2 <br /> I <br /> I <br /> Stormwater Site Plan Page 5 <br /> IMcClean Ironworks Site Improvements August 2014 <br /> I <br />