Laserfiche WebLink
1 <br /> I <br /> Figure 3 -Flow Chart for Determining Additional Requirements for Redevelopment <br /> 1 <br /> Start Here <br /> Does the site have 35%or No No additional <br /> more of existing impervious ► requirements for <br /> coverage? redevelopment apply <br /> Yes <br /> No Is the total of the new plus replaced <br /> Is this a road-related impervious surfaces 5,000 square feet or <br /> more,AND does the value of the proposed <br /> project? improvements-including interior <br /> improvements-exceed 50%of the assessed <br /> p value of the existing site improvements? <br /> Yes R 41 <br /> Does the project add <br /> 5,000 sq ft or more of <br /> new,impervious No No Yes <br /> surfaces? <br /> Yes <br /> Do new impervious No No additional <br /> surfaces add 50%or more <br /> to the existing impervious therequirements for <br /> surfaces within project redevelopment apply <br /> limits? <br /> I <br /> Yes <br /> See Minimum Requirements <br /> #1 through#9 <br /> 1 <br /> I <br /> I <br /> Stormwater Site Plan Page 6 <br /> McClean Ironworks Site Improvements August 2014 <br /> I <br />