My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10632 7TH AVE SE 2025-07-28
>
Address Records
>
7TH AVE SE
>
10632
>
10632 7TH AVE SE 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 2:54:24 PM
Creation date
7/28/2025 2:48:01 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
10632
Notes
FULL DRAINAGE REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OFF-SITE ANALYSIS <br /> I <br /> UPSTREAM ANALYSIS <br /> Based on a site visit and survey data there appears to be offsite flow onto the site from the <br /> northern offsite extension of North Creek. Water enters the site near the northwest corner of the <br /> site via the creek bed and exits at the southwestern corner of the site via the same stream bed.No <br /> water leaves the banks of the stream under ordinary flow conditions. <br /> There are no other offsite areas tributary to the project site's drainage with the exception of <br /> Iapproximately 0.11 acres of existing half street right-of-way. The proposed development will not <br /> change any upstream drainage course or pattern and no impact on upstream drainage is <br /> anticipated. <br /> DOWNSTREAM ANALYSIS <br /> The downstream for Basin 1 relative to this project is to the east of the project site and consists <br /> of runoff that is collected in drainage system within 7th Ave. SE and flows south within the 7th <br /> Ave. SE right-of-way before entering a grass swale located on the southern side of l 10th Place <br /> SE and drains to the east. <br /> Compared to the existing stormwater from Existing Basin 1, the developed Basin 1 includes <br /> approximately a 1/3rd smaller amount of impervious area with very little change to the <br /> downstream drainage courses or patterns; therefore no impact is anticipated to the downstream <br /> drainage. <br /> The downstream for Basin 2 relative to this project is to the west of the project site and consists <br /> of runoff that is collected in a wetland that flows to an onsite portion of North Creek near the <br /> sites west boundary.North Creek flows south until it reaches the Sammamish River. <br /> Stormwater from Basin 2 will be infiltrated and there will be no change to the downstream <br /> drainage courses or patterns,therefore no impact is anticipated to the downstream drainage. <br /> The wetland on the west side of the site is fed by North Creek, with a small amount of storm <br /> drainage infiltration water from our site. <br /> 1 <br /> I <br /> 1 <br /> 6 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.