My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10632 7TH AVE SE Geotech Report 2025-07-28
>
Address Records
>
7TH AVE SE
>
10632
>
Geotech Report
>
10632 7TH AVE SE Geotech Report 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 2:58:52 PM
Creation date
7/28/2025 2:57:48 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
10632
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IJune 6,2008 <br /> Serenity Meadows <br /> L&A Job No. 8A017 <br /> Page 17 <br /> Building Footprint Excavation <br /> Excavation of building footprints, if encountering groundwater, should have the bottom of <br /> excavation sloped and have ditches excavated along the bases of the cut banks to intercept and <br /> IIdirect groundwater seepage to flow into a sump pit from which water can be pumped out of the <br /> pit into a temporary storage and settling pond. A layer of 2-inch crushed rock should be placed <br /> Iover firm subgrade soils under footings, as required, to protect the soils from disturbance by <br /> construction traffic. This crushed rock base should be built to a few inches above groundwater <br /> level, but not less than 6 inches thick. The crush rock base should be placed in lifts not more <br /> than 12 inches in loose state, with each lift compacted to a non-yielding state with a vibratory <br /> mechanical compactor. <br /> IRunoff over Impervious Surfaces <br /> Storm runoff over impervious surfaces,such as roofs and paved roadways and driveways,should <br /> Ibe captured by underground drain line systems connected to downspouts and by catch basins <br /> installed in paved roadways and driveways. Stormwater collected by such drain line systems <br /> I should be tightlined to routed into sediment control structures/oil-water separators before being <br /> released into the under drain of the rain gardens. <br /> Finish Grade around Buildings-11 . <br /> The finish ground, exceptpaved areas, around each buil <br /> ding�, should be graded such that surface <br /> water is directed to flow away from the buildings. We recommend that unpaved finish ground be <br /> sloped at a p gradient of three percent minimum for a distance of at least 10 feet away from each <br /> building. <br /> 1 Building Footing Drains <br /> A subdrain system should be installed around the perimeter footings of each building to <br /> minimize accumulation of groundwater under the buildings. The subdrains should consist of a 4- <br /> LIU & ASSOCIATES INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.