Laserfiche WebLink
IJune 6,2008 <br /> Serenity Meadows <br /> L&A Job No. 8A017 <br /> Page 17 <br /> Building Footprint Excavation <br /> Excavation of building footprints, if encountering groundwater, should have the bottom of <br /> excavation sloped and have ditches excavated along the bases of the cut banks to intercept and <br /> IIdirect groundwater seepage to flow into a sump pit from which water can be pumped out of the <br /> pit into a temporary storage and settling pond. A layer of 2-inch crushed rock should be placed <br /> Iover firm subgrade soils under footings, as required, to protect the soils from disturbance by <br /> construction traffic. This crushed rock base should be built to a few inches above groundwater <br /> level, but not less than 6 inches thick. The crush rock base should be placed in lifts not more <br /> than 12 inches in loose state, with each lift compacted to a non-yielding state with a vibratory <br /> mechanical compactor. <br /> IRunoff over Impervious Surfaces <br /> Storm runoff over impervious surfaces,such as roofs and paved roadways and driveways,should <br /> Ibe captured by underground drain line systems connected to downspouts and by catch basins <br /> installed in paved roadways and driveways. Stormwater collected by such drain line systems <br /> I should be tightlined to routed into sediment control structures/oil-water separators before being <br /> released into the under drain of the rain gardens. <br /> Finish Grade around Buildings-11 . <br /> The finish ground, exceptpaved areas, around each buil <br /> ding�, should be graded such that surface <br /> water is directed to flow away from the buildings. We recommend that unpaved finish ground be <br /> sloped at a p gradient of three percent minimum for a distance of at least 10 feet away from each <br /> building. <br /> 1 Building Footing Drains <br /> A subdrain system should be installed around the perimeter footings of each building to <br /> minimize accumulation of groundwater under the buildings. The subdrains should consist of a 4- <br /> LIU & ASSOCIATES INC. <br />