My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10632 7TH AVE SE Geotech Report 2025-07-28
>
Address Records
>
7TH AVE SE
>
10632
>
Geotech Report
>
10632 7TH AVE SE Geotech Report 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 2:58:52 PM
Creation date
7/28/2025 2:57:48 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
10632
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> June 6,2008 <br /> Serenity Meadows <br /> I L&A Job No. 8A017 <br /> Page 18 <br /> inch-minimum-diameter, perforated, rigid, drain pipe, laid a few inches below the bottom of <br /> perimeter footings The trenches and the drain lines should have a sufficient gradient to generate <br /> flow by gravity. The drain lines should be embedded in washed gravel completely wrapped in <br /> non-woven filter fabric to within about 12 inches of finish grade. The remaining trenches may be <br /> backfilled with clean onsite impervious soils. Water collected by the perimeter footing subdrains <br /> should be tightlined,separately from the roof and surface storrawater drain systems,to discharge <br /> into the under drain of the rain gardens. <br /> I <br /> Cleanouts <br /> ISufficient number of cleanouts at strategic locations should be provided for the underground <br /> drain line systems. The underground drain line systems should be maintained periodically to <br /> Iprevent clogging. <br /> LIMITATIONS <br /> 1 This report has been prepared for the specific application to the subject project for the exclusive <br /> use by J&B Excavating and their associates, consultants, representatives, and contractors. We <br /> recommend that this report, in its entirety, be included in the project contract documents for the <br /> information of the prospective contractors for their estimating and bidding purposes and for <br /> compliance with the recommendations in this report during construction. The conclusions and <br /> interpretations in this report, however, should not be construed as a warranty of the subsurface <br /> Iconditions. The scope of this study does not include services related to construction safety <br /> precautions and our recommendations are not intended to direct the contractor's methods, <br /> techniques, sequences or procedures, except as specifically described in this report for design <br /> considerations. <br /> 1 <br /> LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.