Laserfiche WebLink
:7=IJ=1:it•7e1:A3:lr11x03to] :7eI1&y;Ix03NIW-,A1NI0 6m0:1=17.74111•1TAIL[CI&Wx03NW-,1111[•L61e1kiI•l;j:l•]millet I <br />RECOMMENDATIONS ARE SUBJECT TO OWNER/ CONSTRUCTION MANAGER APPROVAL. ALWAYS CONSULT <br />9. ADDITIONAL TESTING AND INSPECTING, AT CONTRACTOR'S EXPENSE, WILL BE PERFORMED TO <br />F. WEATHER -RESISTIVE BARRIER (WRB) <br />DETERMINE COMPLIANCE OF REPLACED OR ADDITIONAL WORK WITH SPECIFIED REQUIREMENTS. <br />MANUFACTURERS WRITTEN LITERATURE FOR SURFACE PREPARATION, INSTALLATION REQUIREMENTS, AND <br />ACCESSORY MATERIALS. NOT ALL PRODUCTS MAY APPLY, VERIFY WITH ARCHITECT. <br />1. <br />THE WEATHER -RESISTIVE BARRIER ("WRB") SHALL BE INSTALLED CONTINUOUSLY IN A MONOLITHIC <br />10. PREPARING FOR TEST AND INSPECTION REPORTS. <br />STYLE. THE WRB SHALL ENCOMPASS ALL CONDITIONED SPACES ADJACENT TO THE EXTERIOR <br />ELEMENTS; CONNECTING THE BELOW GRADE WATERPROOFING SYSTEM TO THE CONCRETE PODIUM <br />a. ADJUSTING, CLEANING, AND PROTECTION. <br />THE PROJECT WILL CONFORM TO THE FOLLOWING CODES AND STANDARDS: <br />TO THE FRAMED WALL PANELS AND ROOFING. THIS INCLUDES ALL PENETRATIONS INCLUDING <br />b. LUBRICATE HARDWARE AND MOVING PARTS. <br />• 2015 INTERNATIONAL BUILDING CODE (IBC) <br />WINDOWS AND DOORS AND EXTERIOR WALL PENETRATIONS. REFER TO THE BUILDING ENCLOSURE <br />c. ADJUST OPERATING PANELS AND SCREENS TO PROVIDE ATIGHT FIT AT CONTACT POINTS <br />• 2015 WASHINGTON STATE ENERGY CODE (WSEC) <br />SHEETS FOR ADDITIONAL INFORMATION CLARIFYING WATERPROOFING REQUIREMENTS FOR PIPE, <br />AND WEATHER STRIPPING FOR SMOOTH OPERATION, WITHOUT BINDING, AND <br />• REVISED CODE OF WASHINGTON (RCW) <br />DUCT AND SIMILAR PENETRATIONS THROUGH EXTERIOR WALLS. THESE PENETRATIONS MAY BE <br />WEATHERTIGHT CLOSURE. <br />ADDRESSED BY THE USE OF A TARGET DETAIL WITH SEALANT OR BY THE USE OF FLASHING PANEL <br />EVERGREEN SUSTAINABLE DEVELOPMENT STANDARD (ESDS), VERSION 3.0.1 <br />INTEGRATED WITH THE WEATHER -RESISTIVE BARRIER SYSTEM. <br />d. ADJUST HARDWARE FOR PROPER ALIGNMENT, SMOOTH OPERATION, AND PROPER <br />LATCHING WITHOUT UNNECESSARY FORCE OR EXCESSIVE CLEARANCE. <br />A. GENERAL NOTES <br />e. CLEAN FRAME SURFACES IMMEDIATELY AFTER INSTALLING SLIDING DOORS. COMPLY WITH <br />2. <br />ALL SEAMS (VERTICAL AND HORIZONTAL) ARE TO RECEIVE A CONTINUOUS BEAD OF SEALANT AND <br />MANUFACTURER'S WRITTEN RECOMMENDATIONS FOR FINAL CLEANING ANDMAINTENANCE. <br />TO BE ROLLED OR PRESSED TO ENSURE A CONTINUOUS SEAL. REFERENCE DETAIL 9/XBE6.01, <br />AVOID DAMAGING PROTECTIVE COATINGS AND FINISHES. RECOMMEND <br />1. ALL MATERIALS, WORKMANSHIP, DESIGN, AND CONSTRUCTION SHALL CONFORM TO THE DRAWINGS <br />TYPICAL. <br />AND THE INTERNATIONAL BUILDING CODE (IBC), 2015 EDITION. <br />TEMPORARY COVERING OF SILL TRACK TO PREVENT CONSTRUCTION DEBRIS FROM <br />CLOGGING WEEPS. <br />3. <br />APPROVED PRODUCTS: <br />f. CLEAN GLASS IMMEDIATELY AFTER INSTALLING WINDOWS AND SLIDING DOORS. COMPLY <br />2. THE BUILDING ENCLOSURE (BE) DRAWINGS SHALL BE USED IN CONJUNCTION WITH ARCHITECTURAL <br />a. DUPONT: TYVEK DRAINWRAP <br />WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS FOR FINAL CLEANING AND <br />DRAWINGS AND ANY OTHER APPLICABLE DRAWINGS FOR BIDDING PURPOSES ONLY. <br />MAINTENANCE. REMOVE NONPERMANENT LABELS AND CLEAN SURFACES. <br />4. <br />SUPPLEMENTAL MATERIALS: <br />g. REMOVE AND REPLACE GLASS THAT HAS BEEN BROKEN, CHIPPED, CRACKED, ABRADED, <br />3. DIMENSIONS PROVIDED BUILDING ENCLOSURE DRAWINGS SHALL BE USED FOR BIDDING <br />a. DUPONT: STRAIGHTFLASH <br />OR DAMAGED DURING CONSTRUCTION PERIOD. <br />PURPOSES ONLY. CONTRACTOR VERIFY ALL DIMENSIONS. <br />b. DUPONT: FLEXWRAP NF <br />h. PROTECT STOREFRONT, WINDOWAND SLIDING DOOR SURFACES FROM CONTACT WITH <br />c. DUPONT: FLASHING TAPE <br />CONTAMINATING SUBSTANCES RESULTING FROM CONSTRUCTION OPERATIONS. IN <br />4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS, <br />ADDITION, MONITOR SLIDING DOOR SURFACES ADJACENT TO AND BELOW EXTERIOR <br />TECHNIQUES, SEQUENCES OR PROCEDURES REQUIRED TO PERFORM THE WORK. <br />CONCRETE AND MASONRY SURFACES DURING CONSTRUCTION FOR PRESENCE OF DIRT, <br />5. <br />ALTERNATE MATERIALS: <br />SCUM, ALKALINE DEPOSITS, STAINS, OR OTHER CONTAMINANTS. IF CONTAMINATING <br />5. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE <br />a. CONSULT OWNER AND BUILDING ENCLOSURE CONSULTANT <br />SUBSTANCES DO CONTACT SLIDING DOOR SURFACES, REMOVE CONTAMINANTS <br />NOT SPECIFICALLY INDICATED, BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR <br />IMMEDIATELY ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS. <br />DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT TO REVIEWAND APPROVAL BY THE <br />G. WINDOW PENETRATION FLASHING SEQUENCE <br />I. RE -FINISH OR REPLACE STOREFRONTS, WINDOWS AND SLIDING DOORS WITH DAMAGED <br />ARCHITECT AND THE BUILDING ENCLOSURE CONSULTANT. <br />FINISHES. <br />1. <br />REFERENCE APPROVED WINDOW WRAP SEQUENCE - SHEET XBE5.00 <br />j. REPLACE DAMAGED COMPONENTS. <br />6. SPECIAL INSPECTION SHALL BE PERFORMED BY A WABO CERTIFIED TESTING AGENCY DESIGNATED <br />BY THE ARCHITECT AND APPROVED BY THE OWNER. INSPECTION AGENCIES DUTIES SHALL INCLUDE <br />2. <br />INSTALL A "PAN" FLASHING ASSEMBLY AT THE SILL AND PENETRATION FLASHINGS AT THE JAMBS <br />L. AIR LEAKAGE TESTING <br />THE FOLLOWING: <br />AND HEAD FOR STOREFRONT AND FLANGED WINDOW ASSEMBLIES. PENETRATION FLASHING <br />SYSTEM TO BE CONTINUOUS AT HEAD, JAMBS, AND SILL; SEAL CORNERS WITH FLEXIBLE MEMBRANE <br />1. REFERENCE SECTION A. <br />a. VERIFICATION OF STRUCTURAL MEMBER SIZES <br />(SAM), PER THE WINDOW WRAP SEQUENCE. THIS PENETRATION FLASHING WILL PROTECT THE <br />b. VERIFICATION OF SPECIFIED STRESS GRADES OF STRUCTURAL MEMBERS <br />FRAMING AND DIRECT SUBSEQUENT MOISTURE TO THE SILL AND EJECT TO THE EXTERIOR. <br />2. AIR LEAKAGE RESISTANCE: MAXIMUM RATE NOT MORE THAN INDICATED WHEN TESTED ACCORDING <br />c. INSPECTION OF FRAMING ANCHORS, AND BOLTED AND NAILED CONNECTIONS <br />TO AAMA/WDMA/CSA 101/I.S.2/A440, AIR LEAKAGE RESISTANCE TEST. REFER TO 2015 WSEC AND/OR <br />d. INSPECTION OF SHEATHING NAILING SIZE, SPACING, AND INSTALLATION <br />3. <br />AFTER STOREFRONT OR FLANGED WINDOWS ARE INSTALLED, PROVIDE A CONTINUOUS SEALANT <br />ESDS VERSION 3.0 (WHICHEVER IS MORE STRINGENT). <br />e. INSPECTION FOR COMPLETENESS OF STRUCTURAL SYSTEM AS DESCRIBED IN THE <br />JOINT WITH BACKER ROD AT THE INTERIOR SHOULDER OF THE WINDOW/DOOR. SIZE THE ROUGH <br />a. MAXIMUM RATE: 0.3 CFM/SQ. FT. OF AREA AT AN INWARD TEST PRESSURE OF 1.6 LBS./SQ. <br />CONTRACT DOCUMENTS <br />OPENING TO ALLOW FOR THE INSTALLATION OF A SEALANT JOINT AND BACKER ROD. SEALANT <br />FT. <br />JOINT TO BE A MINIMUM OF 3/8". OAC RECOMMENDS A HYBRID BACKER ROD (RECOMMENDED <br />PRODUCT. NOMACO: SOF ROD). <br />7. PRE -MANUFACTURED, PRE-ENGINEERED STRUCTURAL COMPONENTS SHALL BE DESIGNED BASED <br />3. TESTING AGENCY: OWNER WILL ENGAGE A QUALIFIED TESTING AGENCY TO PERFORM TESTS AND <br />ON THE CRITERIA PRESENTED IN THE CONTRACT DOCUMENTS. THE COMPONENT DESIGNER IS <br />INSPECTIONS. TESTING AND INSPECTING AGENCY WILL INTERPRET TESTS AND STATE IN EACH <br />RESPONSIBLE FOR CODE CONFORMANCE, TEMPORARYAND PERMANENT BRACING AND ALL <br />H. EXPOSED METAL FLASHING <br />REPORT WHETHER TESTED WORK COMPLIES WITH OR DEVIATES FROM REQUIREMENTS. <br />NECESSARY CONNECTIONS NOT SPECIFICALLY CALLED OUT ON THE ARCHITECTURAL OR <br />STRUCTURAL DRAWINGS. <br />1. <br />FOR WINDOW AND SLIDING GLASS DOOR HEADS, BOTTOM WALL, DECK EDGE, ROOFING, TRIM, AND <br />4. AIR -INFILTRATION TESTING: <br />OTHER EXPOSED METAL FLASHINGS. <br />a. REFER TO ASTM E 779 FOR TESTING PROCEDURE AND REQUIREMENTS. <br />8. ALL WOOD PLATES IN DIRECT CONTACT WITH CONCRETE OR MASONRY SHALL BE <br />a. PROVIDE A 24 GAUGE, PRE -FINISHED SHEET METAL FLASHING WITH A "KYNAR 500" FINISH <br />PRESSURE -TREATED WITH AN APPROVED PRESERVATIVE. ALL REPLACEMENT DECK POSTS SHALL <br />(OR AS NOTED ON DRAWINGS). <br />BE PRESSURE -TREATED. <br />b. PROVIDE 0.025-INCH STAINLESS STEEL FLASHING ON ROOFS, UNLESS NOTED OTHERWISE <br />M. MOCK-UPS <br />IN THE DRAWINGS. <br />1. PER ESDS, VERSION 3.0, SECTION 7.13B (OPTION #2), PROVIDE FULL-SIZE MOCK-UPS OF ALL <br />B. SPECIFICATIONS: REFER TO PROJECT SPECIFICATION MANUAL ISSUED AS PART OF THE CONTRACT <br />ENVELOPE PENETRATIONS, REVIEWED BY THE ARCHITECT OR INDEPENDENT ENVELOPE <br />DOCUMENTS AND SHEETS XBE0.02 AND XBE0.03 (RECOMMENDED PRODUCT MATRIX) FOR INFORMATION <br />I. NON <br />-EXPOSED METAL FLASHING <br />CONSULTANT, AND MADE AVAILABLE FOR REFERENCE ON THE CONSTRUCTION SITE THROUGHOUT <br />SUPPLEMENTAL TO THESE DRAWINGS. <br />THE CONSTRUCTION PERIOD. <br />1. <br />FOR SADDLES, BOOTS, AND OTHER NON -EXPOSED METAL FLASHINGS. <br />C. COORDINATION: THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING DETAILS AND ACCURACY OF THE <br />a. PROVIDE A 24 GAUGE, FULLY SOLDERED SHEET METAL, HOT -DIPPED GALVANIZED G-90, <br />N. SEALANT PULL TESTS <br />DRAWINGS; TO CONFIRM AND CORRELATE ALL QUANTITIES AND DIMENSIONS; FOR SELECTING <br />UNLESS NOTED OTHERWISE IN THE DRAWINGS. <br />FABRICATION PROCESSES; FOR TECHNIQUES OF ASSEMBLY; AND FOR PERFORMING THE WORK IN ASAFE <br />AND RESPONSIBLE MANNER. <br />2. <br />EXTERIOR WALL PENETRATION FLASHING PANELS (WHERE APPLICABLE). <br />1. CONDUCT PULL TESTS TO VERIFYADHESION. <br />a. WEATHERPROOFING PRODUCTS INC.: QUICKFLASH <br />D. DISCREPANCIES: IN CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS, PLANS, <br />2. ARRANGE FOR SEALANT MANUFACTURER, APPROVED REPRESENTATIVE, OR BUILDING ENCLOSURE <br />DETAILS, OR REFERENCE STANDARDS, THE ARCHITECT/ENGINEER SHALL DETERMINE WHICH SHALL <br />CONSULTANT TO PERFORM TESTS. <br />J. INTERIOR <br />VAPOR BARRIER <br />GOVERN. DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE BUILDING ENCLOSURE <br />CONSULTANT AND ARCHITECT BEFORE PROCEEDING WITH THE WORK. <br />3. CONDUCT PERIODIC PULL TESTS THROUGHOUT THE COURSE OF CONSTRUCTION. RECOMMEND <br />• <br />NOTE: PER TYPICAL AIR BARRIER REQUIREMENTS, CEILING FIXTURES TO BE ABAA-CERTIFIED OR <br />MINIMUM THREE (3) TESTS. <br />SEALED TO GWB CEILING, TYPICAL. <br />E. THE AIR BARRIER SYSTEM <br />1. <br />VERTICAL / HORIZONTAL VAPOR BARRIER (IF DIFFERENT FROM THE WEATHER -RESISTIVE BARRIER - <br />4. COORDINATE WITH SEALANT MANUFACTURER'S INSTALLATION DOCUMENTS REGARDING SURFACE <br />1. THE AIR BARRIER SYSTEM SHALL HAVE THE FOLLOWING CHARACTERISTICS, PER THE 2015 <br />SEE SECTION A). <br />PREPARATION AND PRIMING REQUIREMENTS. <br />WASHINGTON STATE ENERGY CODE, SECTION C402.5.1. <br />2. <br />APPROVED PRODUCTS: <br />O. SITE VISITS <br />a. RECOMMENDED: BENJAMIN MOORE: ULTRA SPEC LATEX VAPOR BARRIER PRIMER SEALER <br />2. THE CONTRACTOR SHALL ADDRESS JOINTS, JUNCTURES AND TRANSITIONS BETWEEN MATERIALS, <br />573 (PVA PAINT) - MEETS OR EXCEEDS ESDS v3.0 VOC LIMIT (100 g/L). <br />PRODUCTS AND ASSEMBLIES FORMING AN AIR -TIGHT ASSEMBLY OF THE BUILDING ENCLOSURE. <br />1. CONTRACTOR RESPONSIBLE FOR SCHEDULING PERIODIC SITE VISITS FOR BUILDING ENCLOSURE <br />a. IT MUST BE CONTINUOUS, WITH ALL JOINTS SEALED. <br />CONSULTANT WITH A CONTRACTOR REPRESENTATIVE TO DISCUSS THE AS -BUILT CONDITIONS, <br />b. IT MUST BE STRUCTURALLY SUPPORTED TO WITHSTAND POSITIVE AND NEGATIVE AIR <br />K. WINDOW &STOREFRONT TESTING <br />DETAILS, AND SITE QUESTIONS. <br />PRESSURES APPLIED TO THE BUILDING ENCLOSURE. <br />1. <br />FIELD WATER PENETRATION RESISTANCE TESTING <br />2. THE FOLLOWING "MILESTONES" ARE TO BE COORDINATED WITH OAC TO MAKE SITE OBSERVATIONS <br />3. THE TYPICAL LINE OF THE AIR BARRIER SHOULD BE TREATED AT THE EXTERIOR OF THE WALL <br />ONCE COMMENCED (1-2 DAYS AFTER PHYSICAL INSTALL START) <br />(WEATHER -RESISTIVE BARRIER), INTEGRATED WITH THE GLAZING AND PENETRATIONS, AND <br />2. <br />PERFORMANCE REQUIREMENTS: <br />a. BELOW -GRADE WATERPROOFING SYSTEM (BENTONITE PANEL, DRAINAGE MAT, <br />CONNECTED TO THE ROOF ASSEMBLY (AT TOP PLATE TO RAFTER CONNECTION - ATTIC SPACE NOT <br />j. GENERAL: PROVIDE FIBERGLASS WINDOWS CAPABLE OF COMPLYING WITH <br />PENETRATIONS THROUGH SYSTEM, TRANSITION DETAILING, DRAINAGE TIE-IN) <br />INCLUDED) AND POST -TENSIONED CONCRETE PODIUM SLAB (WHERE APPLICABLE). SUBSEQUENT <br />PERFORMANCE REQUIREMENTS INDICATED, BASED ON TESTING MANUFACTURER'S <br />b. HORIZONTAL WATERPROOFING SYSTEM (LAYOUT AND PRE -STRIPPING, INITIAL INSTALL <br />LOWER FLOORS ARE ENCOMPASSED IN THE AIR BARRIER THROUGH THE CONCRETE CAST -IN -PLACE <br />WINDOWS THAT ARE REPRESENTATIVE OF THOSE SPECIFIED, AND THAT ARE OF TEST <br />AND DETAILING, TERMINATIONS) <br />SLAB & FOUNDATION WALLS, AND EXTERIOR WALL ASSEMBLIES, SIMILAR TO AS NOTED ABOVE. <br />SIZE REQUIRED BYAAMANVDMA 101/I.S.2/NAFS. <br />c. PANEL WATERPROOFING, ROUGH OPENING PENETRATION FLASHING, WINDOW <br />PENETRATIONS WITHIN SHARED PARTY WALL GWB SHOULD BE MINIMAL TO PREVENT LATERAL AIR <br />k. NO WATER LEAKAGE AS DEFINED IN AAMA/WDMA/CSA REFERENCED TEST METHODS AT A <br />INSTALLATION (INSTALLED OFF -SITE - VISITS TO BE COORDINATED WITH <br />LOSS BETWEEN UNITS AND PENETRATIONS THROUGH THE GWB WALLS AND CEILINGS ARE TO BE <br />WATER TEST PRESSURE EQUALING THAT INDICATED, WHEN TESTED ACCORDING TO <br />INSTALLER/CONTRACTOR, TYPICAL) <br />SEALED AND PRECISE. <br />AAMA/WDMA/CSA 101/I.S.2/A440, WATER PENETRATION RESISTANCE TEST. <br />d. WEATHER -RESISTIVE BARRIER TIE-IN (ON -SITE DETAILING, SLAB EDGE, TERMINATIONS, <br />TIE-IN TOOTH ER SYSTEMS) <br />4. COMPONENTS TO BE ADDRESSED ARE AS FOLLOWS (BUT NOT LIMITED TO): <br />3. <br />TESTING SERVICES: TESTING AND INSPECTION OF INSTALLED WINDOWS AND SLIDING DOORS SHALL <br />e. ALUMINUM STOREFRONT OR CURTAIN WALL SYSTEMS (PENETRATION FLASHING, SUB SILL <br />a. TOP PLATE OF TOP FLOOR - SPRAY FOAM LID (FROM ATTIC) <br />TAKE PLACE AS FOLLOWS: <br />PAN INSTALLATION, INTEGRATION WITH WRB) <br />b. RIM JOIST BAY AT EXTERIOR WALLS <br />a. TESTING METHODOLOGY: TESTING OF WINDOWS FOR WATER RESISTANCE SHALL BE <br />f. ROOFING (VAPOR BARRIER, INSULATION, PROTECTION LAYER, DRAINAGE DETAILING, <br />c. PERIMETER OF STUD BAYS AT EXTERIOR WALLS <br />PERFORMED ACCORDING TO ASTM E 1105. <br />TRANSITIONS, PARAPETS, OVERBURDEN) <br />d. BASE OF WALL AT GROUND FLOOR <br />e. WINDOW & DOOR PENETRATIONS <br />4. <br />FIELD WATER RESISTANCE TESTING PRESSURES: <br />3. REQUIRES MINIMUM 24 HOURS NOTICE PRIOR TO SITE VISIT <br />f. EXTERIOR WALL PENETRATIONS (HOSE BIBS, SPRINKLERS, LIGHT FIXTURES, PIPES, ETC.) <br />a. FIBERGLASS -FLANGED WINDOWS AND SLIDING GLASS DOORS - FIELD WATER RESISTANT <br />VENT PENETRATIONS THROUGH EXTERIOR WALL <br />TEST PRESSURE = AS INDICATED ON THE MANUFACTURER -PROVIDED LABEL BUT NO LESS <br />4. CLIENT TO PROVIDE REPORT DISTRIBUTION LIST <br />THAN 3.0 PSF. <br />h <br />h. PENETRATIONS THROUGH CONCRETE WALLS (WITH ADJACENT CONDITIONED SPACE). <br />b. ALUMINUM WINDOWS - FIELD WATER RESISTANT TEST PRESSURE = AS INDICATED ON THE <br />MANUFACTURER -PROVIDED LABEL BUT NO LESS THAN 6.24 PSF. <br />5. ALL BUILDINGS ARE TO BE TESTED, PER C402.5.1.2 BUILDING TEST. <br />a. PER ESDS (OWNER OPTION) SECTION 5.1A, "OBTAIN ONE ADDITIONAL CREDITS <br />5. <br />FIELD WATER RESISTANCE TESTING PROCEDURES: <br />FROM 2015 WSEC SECTION C406 -ADDITIONAL EFFICIENCY PACKAGE OPTIONS." 2015 WSEC <br />SECTION C406.9 REDUCED AIR INFILTRATION REQUIRES THE WHOLE BUILDING <br />a. TEST PRESSURE: TWO-THIRDS TIMES DESIGN TEST PRESSURE REQUIRED TO DETERMINE <br />PRESSURIZATION TESTING MEETS AN AIR LEAKAGE RATE OF THE BUILDING ENVELOPE <br />COMPLIANCE WITH AAMA/WDMA/CSA 101/I.S.2/A440 PERFORMANCE GRADE INDICATED OR <br />THAT SHALL NOT EXCEED 0.25 CFM/FT2 AT 75 PA (50 PA FOR IRC BUILDINGS).. <br />AS SPECIFIED. <br />b. TESTING SHALL BE IN ACCORDANCE WITH ASTM E779 OR AN EQUIVALENT METHOD <br />b. ALLOWABLE WATER INFILTRATION: NO WATER PENETRATION. <br />APPROVED BY THE CODE OFFICIAL. <br />c. IF THE TEST RATE EXCEEDS THAT DEFINED HERE, A VISUAL INSPECTION OF THE AIR <br />6. <br />TESTING EXTENT: ONE FLANGED WINDOW AND SLIDING DOOR AND STOREFRONT OF EACH TYPE <br />BARRIER SHALL BE CONDUCTED AND ANY LEAKS NOTED SHALL BE SEALED TO THE <br />(TYPICALLY LARGEST, MOST COMMON CONFIGURATION) AS SELECTED BY ARCHITECT OR BUILDING <br />EXTENT PRACTICABLE. AN ADDITIONAL REPORT IDENTIFYING THE CORRECTIVE ACTIONS <br />ENVELOPE CONSULTANT. TESTING SHALL OCCUR AFTER PERIMETER SEALANTS HAVE CURED. <br />TAKEN TO SEAL AIR LEAKS SHALL BE SUBMITTED TO THE BUILDING OWNER AND THE CODE <br />OFFICIAL AND ANY FURTHER REQUIREMENT TO MEET THE LEAKAGE AIR RATE WILL BE <br />7. <br />FAILED WATER TESTED ASSEMBLIES SHALL BE CORRECTED OR REPAIRED ON A WHOLESALE BASIS <br />WAIVED. <br />BY THE MANUFACTURER AND CONTRACTOR, AND BE RE -TESTED UNTIL SPECIFIC WINDOW TYPE <br />PASSES TWO CONSECUTIVE TESTING WITHOUT A FAILURE. <br />5. REFERENCE SHEET XBE0.04 FOR TYPICAL LINE OF THE AIR BARRIER AND SHEET XBE7.00-7.01 FOR <br />TYPICAL CONNECTION DETAILS. <br />8. <br />REMEDIATE OR REMOVE AND REPLACE NON -COMPLYING WINDOWS AND DOORS AND RE -TEST, AS <br />SPECIFIED ABOVE. <br />V) <br />co <br />O <br />N <br />Lu <br />0') <br />LID <br />Z <br />zfn <br />C O <br />O V <br />Z <br />U) <br />Z <br />Q <br />W <br />J <br />LLI <br />U' W <br />O <br />� � <br />W W <br />W W <br />0 <br />• • • N <br />r <br />0 <br />cn <br />m � <br />E <br />0 <br />o <br />�m <br />c r <br />NaD <br />o r m <br />Or U <br />> M <br />m M > <br />Q <br />a <br />- N <br />2� <br />co In m <br />co 00 0 <br />a� <br />N N <br />3 <br />LL - <br />co co 3 <br />O <br />0 N <br />0 <br />00 3 <br />N N <br />N U1 <br />N cn <br />3 <br />GENERAL <br />BUILDING <br />ENCLOSURE <br />NOTES <br />2020-1009 PERMIT SET <br />THE UNDERSIGNED HAS <br />PROVIDED <br />BUILDING ENCLOSURE DOCUMENTS <br />THAT, IN MY PROFESSIONAL <br />JUDGEMENT, ARE APPROPRIATE TO <br />SATISFY THE REQUIREMENTS OF RCW <br />64.55.005 THROUGH 64.55.090. <br />a Mon T000mmmc0--1 <br />COPYRIGHT© 2019 OAC SERVICES, INC. <br />THESE DOCUMENTS, THE IDEAS AND DESIGNS INCORPORATED <br />HEREIN AS AN INSTRUMENT OF SERVICE, ARE THE PROPERTY OF <br />OAC SERVICES, INC. AND ARE NOT TO BE USED IN WHOLE OR IN <br />PART WITHOUT WRITTEN AUTHORIZATION OF OAC SERVICES, INC <br />DESIGN <br />KRM <br />DRAWN <br />KRM <br />CHECK <br />XBEO,01 <br />OAC PROJ. No. <br />R12-2o0��70� <br />