Laserfiche WebLink
• <br />. Requirements for Assembling Inlet Pipes <br /> NOTE:Depending on the system's design, it may be ® Temporarily layout the header/manifold sys- <br /> advantageous to lay out the inlet and outlet pipe systems tern according to the engineer's drawings. <br /> prior to forming the bed of chambers. <br /> i• — ® Place a minimum 12.5 feet(3.8 m) of AASHTO <br /> M288 Class 1 woven geotextile over the bedding <br /> stone under each inlet stub off the manifold sys- <br /> „,, "'4-t1' 'c `'. tern. Check the engineer's drawing to determine if <br /> additional scour control measures are required. <br /> i":-"•4'; Ei Set first chamber of each row aligned with their <br />'• inlet pipes if applicable. A minimum 6" (152 mm)* <br /> clear spacing,measured between feet, is required <br /> ` between adjacent rows.Separate chambers and <br /> inlet fittings as necessary to maintain 6" (152 mm) <br /> clear space between chamber rows. <br /> Scour protection fabric at manifold. iiWith a reciprocating saw, cut an opening for <br />• the inlet piping in the applicable endcaps at the <br /> specified invert height. <br /> , <br /> '1 <br /> }I' ' pipe 1 ' i 141V�� `t�`t Ott endcap. To atilaiMISIVOWA NOTE: topenings do this, take a o anywherey be cut short length pipe and use a <br /> :14 marker to draw an outline of the pipe on the endcap at <br /> I A , , 111 the correct height. <br /> f . , :It 13 Insert the distribution pipes into the endcaps. <br /> 0 Once chamber spacing requirements are met, <br /> • the header/manifold system may be permanently <br /> i assembled. <br /> *6" (152 mm) is the minimum spacing. A wider <br />• 24"(600 mm)inlets are the maximum size that can fit into an spacing may be required as indicated on the <br /> SC-740 end cap and must be prefabricated with a 24"(600 mm) engineer's drawings. <br /> pipe stub.(SC-310 chambers with a 12"(300 mm)inlet pipe NOTE:If Isolator Rows are specified on the engineer's <br /> must use a prefabricated end cap with a 12"(300 mm)pipe stub.) plans, see page 11 for installation instructions. <br />• Requirements for Installing the Chambers <br /> ri, :,,, ,,,.,,,-.,. .:-„, ., „,„ ... „.. F:4411L. 1 EN To begin building the chamber bed, orient <br /> 1 1 -iii=i t the chambers so the end labeled "Build Rows in <br />• - . .•_:..-,-, ' ",1 k 4. This Direction" is closest to the bed's edge and <br /> - L "4 r, -- ; ': ;i the arrows point in the direction of the build. <br /> ° x. Maintain a minimum 6" (152 mm)separation <br /> 0-.,,,r. w _., between chamber rows(measurement taken <br /> from the edge of the foot of the chambers). <br /> , '-' All pipe connections into and out of the chambers <br /> b'° ,i , ' , �+' ' .5 must be through the end caps or the inspection <br />• port knock-out. Never cut a hole in the sides of the <br /> Maintain a minimum of 6"(152 mm)between chamber feel. chamber. <br /> 4 Call StormTech at 888.892.2694 for technical and product information or visit www.stormtech.com. <br />