My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9421 18TH AVE W LILYS COURT 2025-07-29
>
Address Records
>
18TH AVE W
>
9421
>
LILYS COURT
>
9421 18TH AVE W LILYS COURT 2025-07-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 7:30:49 AM
Creation date
7/29/2025 7:21:46 AM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9421
Tenant Name
LILYS COURT
Notes
TECHNICAL INFORMATION REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. <br /> 4 <br /> 0 Requirements for Joining the Chambers StormTech° <br /> `," A``V A chambers end corrugations are sized differently to allow for an <br /> ,A , overlapping joint. To ensure proper joint fit, orient all chambers in <br /> the bed with their arrows pointing in the direction of the build. The <br /> chambers overlapping feet are a distinguishing feature to help <br /> quickly identify the proper chamber orientation. <br /> * j fl Construct the chamber bed by overlapping <br /> (f ` '' f = the chambers lengthwise in rows. Attach chambers <br /> i„ by overlapping the end corrugation of one chamber <br /> i i ? � „. P onto the end corrugation of the last chamber in the <br />• i t r r /' row. Be sure that chamber placement does not <br /> , f i exceed the reach of the construction equipment <br /> • <br /> Construct the chamber bed by overlapping the chambers end used to place the stone. <br /> NOTE:Do not overlap more than one corrugation. <br /> corrugations. <br />. Pip rear is for Attaching the End Caps <br /> ' ` in Lift the end of the chamber a few inches off <br /> the ground.With the curved face of the end <br /> cap facing outward, place the end cap into the <br /> ,. chambers end corrugation. <br /> NOTE End caps are required only at the beginning and <br /> the end of each row of chambers. <br /> .1 <br /> • <br /> ilk , • <br /> Lift the end of the chamber and place the end cap into the end <br /> corrugation. <br /> Requirements for Placing Stone Over the Chambers <br />.• <br /> Clean, crushed, angular stone meeting the specifi- <br /> cations in Tables 4& 5 and Figure 1 on page 10 may <br /> '/ be placed over the chambers with an excavator, <br /> '.. joi. . ... pushed with a dozer or walked in with a stone <br /> .�:`"_ c tti y., '- --�F- . conveyer boom. Each method has benefits and <br />'9 3► ,: limitations. These three processes will be <br /> explained separately, however there are some <br /> - - ., . common requirements for each:The 6" (152 mm) <br /> minimum clear spacing must always be maintained <br /> ,, between adjacent StormTech's chamber rows; and, <br /> "� construction vehicle loads must not exceed the <br />• A minimum of three feet(914 mm)cover is required for trucks to requirements of Tables 1 &2 on page 9. <br /> dump stone.(See page 7) <br /> Call StormTech At 888.892.2694 for technical and product information or visit www.stormtech.com 5 <br /> 4. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.