Laserfiche WebLink
• <br />• <br /> 1. Worksheet"A" <br /> DRAINAGE INFORMATION SUMMARY FORM <br />• <br /> Project Name: LILLY'S COURT Project File Number: <br /> Project Applicant: Project Engineer <br />• Harvey Trucking Jesse Jarrell, P.E. <br /> 10325 Airport Way Western Engineers Inc. <br /> Snohomish, WA 98296 13000 Hwy 99 South <br /> (360) 568-4801 (425) 356-2700 <br />• Project Total Area: 0.57 acres Number of Units: 8 (4 Duplexes) <br /> Project Development Area: 0.46 acres <br /> Summary Table <br />• <br /> Drainage Basin Information: <br /> Number of Basins: 1 <br /> Basin A <br />• Analysis Type: City of Everett Small Project <br /> On Site Developed Area: 0.46 acres <br /> Type of Storage: Storm Chamber Detention <br />• <br /> Approximate Storage Volume: 5,549 cf. <br /> Soil Types: Alderwood Gravelly Sandy Loam <br />• Type of Water Quality Measure Proposed: Catch Basin"storm filter" <br />• <br /> E: /2011 / 111103A/Drainage Report.doc <br />• <br />