My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9421 18TH AVE W LILYS COURT 2025-07-29
>
Address Records
>
18TH AVE W
>
9421
>
LILYS COURT
>
9421 18TH AVE W LILYS COURT 2025-07-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 7:30:49 AM
Creation date
7/29/2025 7:21:46 AM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9421
Tenant Name
LILYS COURT
Notes
TECHNICAL INFORMATION REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Clearing limits of the project are shown on the engineering drawings. All bare and <br /> disturbed soils shall note be left uncovered or unstabilized for more than 2 days during <br />• winter grading (October 1 to April 30) or 7 days for summer grading (May 1 to <br /> September 30). Cleared areas shall be covered temporarily with plastic or with straw <br /> mulch or hydro seeded if plans do not call for work in the area. A Construction entrance <br /> will be utilized to remove heavy soil debris from trucks leaving the site. <br />• <br /> Best Management Practices will be used in this project such as silt fences, interceptor <br /> trenches, sedimentation ponds (where necessary), hydro seeding of cleared land and other <br /> passive means to contain and control erosion and sediment. <br />• Core Requirement#6—Maintenance and Operations <br /> Storm Chamber Detention system and storm filter are to be maintained by future home <br /> owner's association. Roof drains to splash blocks to be maintained by associated <br /> individual unit owners. Refer to section 9 of this report for Maintenance and Operations <br />• information. <br /> Core Requirement#7—Financial Guarantees and Liability <br /> The owner and/or contractor for each individual portion of the work will guarantee all <br />• erosion and drainage work on the site as Bonds or another form of financial guarantee. <br /> The contractor will guarantee the work for a period of time and ultimately the property <br /> owner will guarantee the long-term promise of all maintenance. <br /> Core Requirement#8—Water Quality <br />• Water quality treatment is to be provided by the installation of a catch basin storm filter <br /> located at the north end of the drive aisle system. All new lawn areas are to be <br /> constructed with amended soils to provide minor water quality of pollution generating <br /> pervious surfaces. No other pollution generating surfaces are proposed for the <br />• development. <br />• <br />• <br /> E: /2011 / 111103A/Drainage Report.doc <br />• ,� <br />
The URL can be used to link to this page
Your browser does not support the video tag.