Laserfiche WebLink
9610 19th Avenue SE 41/ <br /> July 27, 2012 <br /> Revised September 18, 2012 <br /> Page 13 <br /> 7. Protect Drain Inlets <br /> Silt fencing as well as catch basin protection has been included in the ESC plan to <br /> capture any sediment-laden runoff during the construction phase. <br /> 8. Stabilize Channels and Outlets <br /> This project has no outlets so this element does not apply. <br /> 9. Control Pollutants <br /> Silt fencing as well as catch basin inlet protection has been included in the ESC plan <br /> to capture any sediment-laden runoff during the construction phase. In addition, the <br /> equipment used on site will be required to be in good working order. <br /> 10. Control Dewatering <br /> It is not anticipated that any dewatering will be required. <br /> 11. Maintain BMPs <br /> The contractor is required to maintain all BMPs on the site until all soils are stabilized <br /> on the site at the end of construction. <br /> 12. Manage the Project <br /> The contractor is required to manage the subcontractors on the site throughout the <br /> course of construction. This includes managing the effects of their operations on the <br /> erosion control BMPs on the site. <br /> Ph: (206)403-0933, email:jayd@deckerce.com <br />