Laserfiche WebLink
erosion. Therefore, these BMPs are not proposed for use on this site. <br /> However, Soil Amendments, Quality and Depth (BMP 12.20) per Chapter 12 <br /> within Volume III of the Drainage Manual will be implemented on all disturbed <br /> perilous surface areas. See Construction Plans under a separate cover for <br /> location and specifications. <br /> Minimum Requirement #6: Runoff Treatment: Based on the requirements of <br /> Chapter 4, Volume I of the Stormwater Manual, this site will be required to <br /> provide Basic Runoff Treatment. Both basins will use cartridge media filtration <br /> as allowed per Chapter 13 of Volume III of the City of Everett Stormwater <br /> Manual to meet water quality requirements. See Onsite Stormwater Analysis in <br /> Section 4 of this report. <br /> Minimum Requirement #7: Flow Control: Both basins will use a Detention <br /> Vault per Section 3.2.3 of Volume III of the City of Everett Drainage Manual. <br /> See Onsite Stormwater Analysis in Section 4 of this report. <br /> Minimum Requirement #8: Wetlands Protection: The existing wetlands and <br /> seasonal stream located on the east side of the site will not be impacted by <br /> construction. Most of the proposed activities will occur outside of the required <br /> wetland buffer. All impacted areas within the wetland buffer will be restored <br /> to their natural condition or improved based on the wetland buffer mitigation <br /> plan. Additionally, the wetland outflow locations and flowpath will be <br /> maintained in the developed condition. <br /> Minimum Requirement #9: Operation and Maintenance: See Operations and <br /> Maintenance in Section 5 of this report. <br /> July 2014 1-3 LDC Job No. 13-144 <br />