Laserfiche WebLink
Element 6: Protect Slopes: All cut and fill slopes will be designed, constructed, and <br /> protected in a manner that minimizes erosion. The following specific BMPs will be <br /> used to protect slopes for this project: <br /> • Temporary and Permanent Seeding (BMP C120) <br /> • Mulching (BMP C121) <br /> • Plastic Covering (BMP C123) <br /> • Surface Roughening (BMP C130) <br /> Element 7: Protect Permanent Drain Inlets: All storm drain inlets during construction <br /> shall be protected to prevent unfiltered or untreated water from entering the <br /> drainage conveyance system. The following specific BMPs will be used to protect <br /> inlets for this project: <br /> • Storm Drain Inlet Protection (BMP C220) <br /> Element 8: Stabilize Channels and Outlets: All channels and outlets will be stabilized <br /> to prevent the outflow of unfiltered or untreated water. The following specific BMPs <br /> will be used to protect inlets for this project: <br /> • Channel Lining (BMP C202) <br /> • Outlet Protection (BMP C209) <br /> Element 9: Control Pollutants: Pollutant Control Notes listed on sheet ER-02 of the <br /> construction plans specify pollutant controls. <br /> • Concrete Handling (BMP C151) <br /> Element 10: Control De-Watering: De-watering Control Notes listed on sheet ER-02 of <br /> the construction plans specify de-watering controls. <br /> July 2014 2-3 LDC Job No. 13-144 <br />