Laserfiche WebLink
Element 11: Maintain BMP's: Maintenance of BMP's are specified in the <br /> Erosion/Sedimentation Control Notes listed on sheet ER-01 of the construction plans. <br /> Element 12: Manage the Project: See elements listed above for management of this <br /> project. BMPs shall be maintained per Element 11. From October 1 through April 30, <br /> clearing, grading, and other soil disturbing activities shall only be permitted if shown <br /> to the satisfaction of the local permitting authority that silt-laden runoff will be <br /> prevented from leaving the site. <br /> July 2014 2-4 LDC Job No. 13-144 <br />