My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12728 19TH AVE SE BASE FILE 2025-07-29
>
Address Records
>
19TH AVE SE
>
12728
>
BASE FILE
>
12728 19TH AVE SE BASE FILE 2025-07-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 9:32:25 AM
Creation date
7/29/2025 9:31:06 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12728
Tenant Name
BASE FILE
Notes
FULL DRAINAGE REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'10) <br /> NOV 1 + <br /> 2007 <br /> ittstgit <br /> Crnf <br /> ; 8d :P-r <br /> '14 _ _ <br /> J <br /> November 9, 2007 <br /> John Jimerson <br /> City of Everett Planning Department <br /> 2930 Wetmore, Suite 8-A <br /> Everett, WA 98201 <br /> Re: Review Responses for Builders Investment Group Office Building dated August 8, 2007. <br /> Dear Mr. Jimerson, <br /> I have revised the attached plans based on your review comments..The review comments are <br /> numbered on the letter and have been addressed as follows: <br /> Mitigation Comments: <br /> 1. The applicant has paid the mitigation fee prior to any issuance of permits. <br /> Developer Comments: <br /> 1. A Public Works Permit has been obtained for this project, and detailed drawings have <br /> been submitted to the Public Works Department. <br /> 2. All parking is per the City Zoning Code and City Design and Construction Standards for <br /> the Development. <br /> 3. This project complies with the current City of Everett Building Code and Sprinkler <br /> Ordinance. Note has been added on road and drainage plan. <br /> 4. Any special charges applicable are being used. <br /> 5. A fire hydrant is proposed within 200 driving feet of every structure but not closer than <br /> 50 feet of every structure. <br /> 6. City streets shall be kept clean and clear during all construction.Note has been added on <br /> grading and TESC plan. <br /> 7. As-builts of storm sewer, sanitary sewer and water systems will be submitted to the city. <br /> 8. Any broken or damaged sidewalk will be replaced.Note has been added on road and <br /> drainage plan. <br /> 9. Walkways are provided to connect the building entrance to the public sidewalk. <br /> 10. All exposed ground will be reseeded within 30 days of construction completion.Note has <br /> been added on grading and TESC plan. <br /> 11. Temporary erosion control will be put into effect before any clearing or earthwork.Note <br /> has been added on grading and TESC plan. <br /> 12. A traffic mitigation fee will be paid prior to permit issuance. <br /> 13. A separate, designated drain line for each strip mall space that would serve the tenant's <br /> fats, oils and grease (FOG)bearing kitchen drains is not required. The proposed building <br /> is going to be used as an office. <br /> 3630 Colby Ave • Everett,WA 98201 • Phone: (425) 303-9363 <br /> Fax: (425) 303-9362 • Email:info@insightengineering.net / 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.