My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 23RD DR W SEAWAY CORP 3C 2025-07-29
>
Address Records
>
23RD DR W
>
5901
>
SEAWAY CORP 3C
>
5901 23RD DR W SEAWAY CORP 3C 2025-07-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:12:19 AM
Creation date
7/29/2025 11:12:18 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5901
Tenant Name
SEAWAY CORP 3C
Notes
STORM DRAINAGE ANALYSIS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11235 SE 6TH STREET r 425.453.9501 <br /> SUITE 220 F 425.453.8208 V S i,L a�t el:' ► <br /> BELLEVUE,WA 98004 WWW.PACIAND.COM <br /> Memorandum <br /> Date: July 7, 2008 <br /> To: Jane Zimmerman, City of Everett Public Works <br /> 3200 Cedar Street Z (4 <br /> Everett, WA 98201 <br /> From: Steven Pesce lC'J <br /> � <br /> Subject: Stormwater Pond Sizing <br /> Lots 3C and D — Seaway Center <br /> This memo serves as written agreement with the City to formally allow the stormwater pond on <br /> lot 3D to be constructed large enough, at this time, to serve the approved development on lot 3C <br /> and future proposed development on lot 3D. <br /> As long as future development meets the design assumptions for the pond with respect to the total <br /> amount of area draining to the pond and the percent impervious of that area, it is agreed that <br /> enlargement of the pond to provide additional detention or retention storage volumes will not be <br /> required by the City for further development of lot 3D. However, modifications to the pond's <br /> flow control structure may be required when future development occurs. <br /> The pond is located north of Lot 3C on Lot 3D, which is owned by the Northshore Christian <br /> Church. This pond collects stormwater from the Narbeck Creek Basin, which consists of basin <br /> areas on Lot 3C as well as Lot 3D. <br /> Details for the contributing basins on each lot are as follows: <br /> Lot 3C Lot 3D _. <br /> Drainage Area _ 3.33 acres 4.21 acres <br /> Pervious CN 86 86 <br /> Impervious CN 98 _ 98 <br /> Soil Type <br /> Pervious Area 0.77 acres Min. 0.42 acres <br /> Percent Impervious 77% Max. 90% <br /> Impervious Area 2.56 acres Max. 3,79 acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.