My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 23RD DR W Geotech Report 2025-07-29
>
Address Records
>
23RD DR W
>
5901
>
Geotech Report
>
5901 23RD DR W Geotech Report 2025-07-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:15:42 AM
Creation date
7/29/2025 11:14:32 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5901
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> October 22, 2007 <br /> Project No. T-5922-1 <br /> Accordingly, for temporary excavations of more than 4 feet and less than 20 feet in depth, the side slopes in Type <br /> C soils should be laid back at an inclination of 1.5:1 or flatter. Temporary excavations in Type A soils can be <br /> laid back at an inclination of 0.75:1. If there is insufficient room or other conditions that restrict completion of <br /> the excavations in the manner described above,or if excavations greater than 20 feet deep are planned,temporary <br /> shoring will likely be required to support the excavations. <br /> 111 We did not observe indications of significant groundwater seepage in our site explorations. However, the <br /> development of a perched groundwater table is possible during the wet winter months. Based on our study, we <br /> expect that the volume and rate of flow of any perched groundwater into site excavations would be relatively <br /> minor and would not be expected to impact the stability of the excavations when completed, as described. In our <br /> opinion, if necessary, a system of shallow collection trenches and conventional sump pumping procedures should <br /> be capable of maintaining a relatively dry excavation for construction purposes. <br /> This information is provided solely for the benefit of the owner and other design consultants, and should not be <br /> construed to imply that Terra Associates, Inc. assumes responsibility for job site safety. It is understood that job <br /> site safety is the sole responsibility of the project contractor. <br /> 5.5 Foundations <br /> The buildings may be supported on conventional spread footing foundations bearing on competent native soils or <br /> on structural fills placed above competent native soils. Foundation subgrades should be prepared as <br /> recommended in Section 5.2 of this report. Perimeter foundations exposed to the weather should be a minimum <br /> depth of 1.5 feet below final exterior grades. Interior foundations can be constructed at any convenient depth. <br /> We recommend designing foundations supported by competent native soils or structural fill for a net allowable <br /> bearing capacity of 3,000 pounds per square foot (psf). For short-term loads, such as wind and seismic, a one- <br /> third increase in this allowable capacity can be used. With the anticipated building loads and this bearing stress, <br /> estimated total foundation settlement should be less than one-half inch. <br /> For designing foundations to resist lateral Ioads, a base friction coefficient of 0.35 can be used. Passive earth <br /> pressure acting on the sides of the footings may also be considered. We recommend calculating this lateral <br /> resistance using an equivalent fluid weight of 300 pounds per cubic foot(pcf). We recommend not including the <br /> upper 12 inches of soil in this computation because they can be affected by weather or disturbed by future <br /> grading activity. This value assumes the foundations will be constructed neat against competent native soil or the <br /> excavations are backfilled with structural fill as described in Section 5.2 of this report. The recommended <br /> passive and friction values include a safety factor of 1.5. <br /> 5.6 Slab-on-Grade Floors <br /> Slab-on-grade floors may be supported on subgrades that are prepared as recommended in Section 5.2 of this <br /> report. Immediately below the floor slabs, we recommend placing a four-inch thick capillary break Iayer of <br /> clean, free-draining, coarse sand or fine gravel that has less than three percent by weight of material passing the <br /> No. 200 sieve. This material will reduce the potential for upward capillary movement of water through the <br /> underlying soil and subsequent wetting of the floor slabs. <br /> I <br /> Page No. 9 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.