Laserfiche WebLink
Preliminary Stormwater Site Plan Everett,WA <br /> Table of Contents <br /> 1 Section Page <br /> Preliminary Stormwater Site Plan 2 <br /> I. Project Overview 2 <br /> a. Project Location <br /> b. Design Criteria <br /> c. Proposed Drainage System <br /> d. Conclusion <br /> II. Preliminary Conditions Summary 4 <br /> a. Existing Conditions <br /> b. Discharge at Natural (Existing) Location <br /> ' c. Wells, Septic Tanks and Fuel Tanks <br /> d. Existing Topographic Map <br /> e. Existing Drainage Basin Map <br /> III. Off-Site Analysis 5 <br /> a. Downstream Analysis <br /> b. Upstream Analysis <br /> IV. Analysis and Design of Required Erosion and Sediment Control BMPs 5 <br /> a. Construction Sequence and Procedure <br /> b. Soil Stabilization and Sediment Trapping <br /> c. Permanent Erosion Control and Site Restoration <br /> d. Inspection Sequence <br /> e. Control of Pollutants Other Than Sediments <br /> f. Utilities <br /> V. Analysis and Design of Required Runoff Control BMPs 7 <br /> VI. Special Reports and Studies <br /> a. Preliminary Geotechnical Report <br /> b. Storm Drainage Analysis of Existing Kenilworth Hills #1 Pond Basin by <br /> PACLAND, dated February 14, 2010. <br /> VII. Other Permits <br /> VIII. Miscellaneous Forms and Worksheets <br /> IX. Maintenance and Operation Requirements <br /> 1 <br /> I <br /> PACLAND Job# 50175001 Page 1 <br />