Laserfiche WebLink
I <br /> Preliminary Stormwater Site Plan Everett, WA <br /> I <br /> Project Overview <br /> I <br /> Project Location <br /> I P o s s e s s i o n <br /> S o rl n e �,P' 1- up <br /> 5r 01 Darlington % c <br /> 1 <br /> yr WuKdti <br /> < <br /> eq t-y' m <br /> Mukilteo: 44u <br /> I Mukitteo 2n$Sk <br /> aR N ro o <br /> State Parkgo St. ��-, Ci <br /> 525 p <br /> VO Sk• co <br /> I 0-) <br /> s ttorill Creek Pky <br /> a <. Q fi� <br /> 10th St Merrill Creek <br /> I Proposed Development Seaway 40 Everett <br /> a; <br /> I <br /> 3�eway� <br /> as �� <br /> 525 'Aq <br /> Id 75th St S\\A <br /> co <br /> {+ Q <br /> » J <br /> Lo <br /> a 80thStSW <br /> p <br /> 81stPISy� 1D <br /> * 526 <br /> I Nelsons Paine Field 526 <br /> Corner 526W Casino Rd <br /> Location: East side of 36`h Avenue West, Everett, WA in the Seaway Center Business Park, <br /> Iadjacent to the existing Intermec site. The site is situated in the SW Everett/ Paine Field <br /> Subarea Plan and EIS. <br /> ISection/Township/Range: SE Ya Sec. 03, T.28N, R.4E of W.M. <br /> IParcel/Tax Lot: 280403-004-008-00 <br /> Size: 35.74 acres <br /> ICity, County, State: Everett, Snohomish County, Washington <br /> IGoverning Agency: City of Everett <br /> Design Criteria: City of Everett Stormwater Management Manual, January 1997 and 1992 <br /> IDOE Stormwater Manual. <br /> IPACLAND Job # 50175001 Page 2 <br />