My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 90TH ST SW 2025-07-29
>
Address Records
>
90TH ST SW
>
1130
>
1130 90TH ST SW 2025-07-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 2:29:13 PM
Creation date
7/29/2025 2:16:05 PM
Metadata
Fields
Template:
Address Document
Street Name
90TH ST SW
Street Number
1130
Notes
TARGETED DRAINAGE REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> B. SWPPP Minimum Elements <br /> 1: Preserve Vegetation and Mark Clearing Limits <br /> The first step in the construction process is for the contractor to fence the limits of <br /> clearing/disturbance (BMP C103) prior to any other construction activity. The engineering <br /> plans locate and provide the square footages for the areas of grading, clearing, impervious <br /> surfaces and un-disturbed areas on the proposed site. As much of the natural vegetation <br /> as possible will be preserved on this project (BMP C101). Approximately 100% of the <br /> entire site will be cleared or disturbed for this project. <br /> 2: Establish Construction Access <br /> The SWPPP calls for the proposed construction entrance (BMP C105) to be installed as <br /> the second step after the staking of clearing limits. At this time winter work is expected <br /> during the wet season. <br /> 3: Control Flow Rates <br /> This project is below the thresholds requiring flow control for the project. <br /> 4: Install Sediment Controls <br /> This site SWPPP proposes to construct/maintain a gravel entrance (BMP C105), <br /> vegetative buffer (BMP C102), silt fencing (BMP C233) and retention of the existing <br /> vegetation (BMP C101) that will provide a vegetated strip around the work area and any <br /> adjacent property line. The construction of these features should be completed before the <br /> clearing and grading of the site. Mulch (BMP C121) will also be used on the exposed soil <br /> as necessary to limit erosion. In addition, streets shall be cleaned as needed at the end of <br /> each work day or through out the day if dirt and debris is tracked onto the paved surfaced. <br /> 5: Stabilize Soils <br /> The "Construction Sequence" calls for the stabilization of soils that remain unworked for <br /> certain lengths of time based on the time of year. Bare/disturbed soils shall remain <br /> uncovered or un-stabilized for no more than 2 days from Oct. 1 —April 30 and no more <br /> than 7 days from May 1 — Sept. 30. Stabilization techniques may include but not limited <br /> to mulching (BMP C121), plastic sheeting (BMP C123) or hydroseeding (BMP C120), <br /> notes have been added to the plan regarding protection for the stock pile area if <br /> necessary. A stockpile area has been identified on the SWPPP and is setback a minimum <br /> of 25-feet from any down slope property line. In addition, during dry periods soil should be <br /> covered or wetted (BMP C140) to reduce the production of dust. <br /> 6: Protect Slopes <br /> All disturbed slopes on site during construction are required to be protected with mulch <br /> (BMP C121) or other means as specified in the construction sequence like surface <br /> roughening (BMP C130). No concentrated runoff or significant amounts of sheet flow will <br /> be directed to new cut or fill slopes during construction (BMP C206). <br /> 7: Protect Drain Inlets <br /> The runoff from this project to the south within the R.O.W. will pass over a vegetated <br /> shoulder/swale before being collected by an existing CB. This will provide the necessary <br /> protection of the downstream system from sediment laden runoff. Silt socks may be added <br /> to the downstream CB if needed during construction. <br /> 8: Stabilize Channels and Outlets <br /> OLYMPIC TERRACE CONDOS 13-0605 <br /> June 2013 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.