My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 90TH ST SW 2025-07-29
>
Address Records
>
90TH ST SW
>
1130
>
1130 90TH ST SW 2025-07-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 2:29:13 PM
Creation date
7/29/2025 2:16:05 PM
Metadata
Fields
Template:
Address Document
Street Name
90TH ST SW
Street Number
1130
Notes
TARGETED DRAINAGE REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No new channels or outlets are proposed for this site except for the splash blocks and <br /> transition zone which will not create a concentrated flow condition. <br /> 9: Control Pollutants <br /> No outside chemicals are expected to be necessary for the construction of this project. All <br /> vehicles working on and around the site would need to meet the State requirements for <br /> emissions. <br /> 10: Control DeWatering <br /> DeWatering may be necessary for this project. However, the existing vegetation retained <br /> on site would be available to spread any water from construction for filtration and disposal. <br /> 11: Maintain BMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during <br /> construction and working with the City to relocate or add BMPs as necessary as site <br /> conditions change. BMPs should be inspected and maintained as needed after every rain <br /> event producing more than 1/4" of rain in a 24-hour period. Also, SMPs shall be inspected <br /> on a weekly basis even if site work is not occurring. <br /> 12: Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the City Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to <br /> control the quality of stormwater discharges. <br /> Whenever inspection and/or monitoring reveals that the BMPs identified in the <br /> Construction SWPPP are inadequate, due to the actual discharge of or potential to <br /> discharge a significant amount of any pollutant, appropriate BMPs or design changes shall <br /> be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the site. <br /> The SWPPP shall be modified whenever there is a change in the design, construction, <br /> operation, or maintenance at the construction site that has, or could have, a significant <br /> effect on the discharge of pollutants to waters of the state. <br /> The SWPPP shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that <br /> the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include <br /> additional or modified BMPs designed to correct problems identified. Revisions to the <br /> SWPPP shall be completed within seven days following inspection. <br /> OLYMPIC TERRACE CONDOS 13-0605 <br /> June 2013 Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.