Laserfiche WebLink
Marlene Bissell 10-Unit Condo's <br /> Drainage Report <br /> Section 6 - Proposed Erosion Control BMP's <br /> General Construction Practices <br /> Several measures are proposed to minimize erosion. During construction, silt fences will be <br /> erected along the perimeter of the site to prevent sediment-laden stormwater from entering the <br /> existing drainage system. Stockpiles will be covered within 24 hours. At a minimum, site <br /> stabilization after grading is completed will include hydroseeding or equal. <br /> Winter Construction <br /> In addition to the best management practices described above, further measures will be proposed <br /> if construction is to occur during the winter months, although this is not anticipated. For <br /> protection of disturbed slopes,the preferred method is hydroseeding or mulching. Wood chips, <br /> straw or corn stalks are acceptable materials. Other methods for protecting slopes include clear <br /> plastic sheeting, straw with jute mat or coconut fiber mats staked in place. <br /> 8 <br />