Laserfiche WebLink
EAUG 2 8 2022 4 <br /> CITY OF EVERETT <br /> Permit Services Inc.E O Group Northwest, Inc• Geoteehnical Engineers,Geologists <br /> &Environmental Specialists <br /> August 22m1 2022 G-5756 <br /> Mr. Ben Erickson <br /> Email: ben@teamsquarefoot.com <br /> Subject: Geotechnical Engineering Investigation <br /> Proposed Addition <br /> 5010 Dover Street <br /> Everett,Washington <br /> Dear Mr.Erickson: <br /> At your request, GEO Group Northwest, Inc., conducted a geotechnical engineering <br /> investigation of the above-subject location for a proposed 13-foot addition to your house in <br /> Everett,Washington. We understand that Phillips Creek and a geologically hazardous slope are <br /> mapped onsite well into the existing property, and that the proposed addition will extend into this <br /> critical area thus requiring an exemption to permit the project. The scope of our services included <br /> a review of the geologic maps of the area and providing a characterization of the subsurface soil <br /> and groundwater conditions encountered,preparation of boring logs(attached)and preparation <br /> of this geotechnical report. <br /> BACKGROUND INFORMATION <br /> We understand that an exemption is required to allow construction in the critical buffer because <br /> the addition must not extend into the buffer more than the existing footprint of the house,the <br /> deck in this case. The proposed structure is to be an additional 4 feet to the west and 11 feet to <br /> the south, into the critical area. In this case the buffer shall be 25 feet beyond the point where the <br /> slope becomes 25%or less. Then to maintain the integrity of the buffer a building setback <br /> requirement is applied from the edge of the buffer of 10 feet. This would prohibit development <br /> on this property which is why an exemption is required to permit the proposal. <br /> 13705 Bel-Red Road • Bellevue,Washington 98005 <br /> Phone 425/649-8757 • Fax 425/649-8758 <br />