My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8102 EVERGREEN WAY EVERETT 4 CORNERS 2025-08-06
>
Address Records
>
EVERGREEN WAY
>
8102
>
EVERETT 4 CORNERS
>
8102 EVERGREEN WAY EVERETT 4 CORNERS 2025-08-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2025 3:42:32 PM
Creation date
7/31/2025 2:38:17 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8102
Tenant Name
EVERETT 4 CORNERS
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1625
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
im <br />Four Corners Short Plat <br />Stormwater Site Plan <br />All temporary erosion and sediment control BMPs shall be removed within 30 days after the final site <br />stabilization is achieved or after the temporary BMPs are no longer needed. Trapped sediment shall <br />be removed or stabilized on site. Disturbed soil resulting from removal of BMPs or vegetation shall be <br />permanently stabilized. <br />12. Manage the Project <br />Erosion and sediment control BMPs for this project have been designed based on the following <br />principles: <br />• Design the project to fit the existing topography, soils, and drainage patterns. <br />• Emphasize erosion control rather than sediment control. <br />• Minimize the extent and duration of the area exposed. <br />• Keep runoff velocities low. <br />• Retain sediment on site. <br />• Thoroughly monitor site and maintain all ESC measures. <br />• Schedule major earthwork during the dry season. <br />In addition, project management will incorporate the key components listed below: <br />Phasing of Construction: <br />• The construction project is being phased to the extent practicable in order to prevent excessive <br />soil erosion, and, to the maximum extent possible, the transport of sediment from the site during <br />construction. <br />• Revegetation of exposed areas and maintenance of that vegetation shall be an integral part of <br />the clearing activities during each phase of construction, per the Scheduling BMP (C 162). <br />Seasonal Work Limitations <br />• From October 1 through April 30, clearing, grading, and other soil disturbing activities shall only <br />be permitted if shown to the satisfaction of the local permitting authority that silt -laden runoff will <br />be prevented from leaving the site through a combination of the following: <br />■ Site conditions including existing vegetative coverage, slope, soil type, and proximity to <br />receiving waters; and <br />■ Limitations on activities and the extent of disturbed areas; and <br />■ Proposed erosion and sediment control measures. <br />• Based on the information provided and/or local weather conditions, the local permitting authority <br />may expand or restrict the seasonal limitation on site disturbance. <br />• The following activities are exempt from the seasonal clearing and grading limitations: <br />■ Routine maintenance and necessary repair of erosion and sediment control BMPs; <br />■ Routine maintenance of public facilities or existing utility structures that do not expose the soil <br />or result in the removal of the vegetative cover to soil; and <br />CPH Project No. 0024-18-042 <br />CPIH CONSULTANTS <br />October 23, 2020 <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.