My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8102 EVERGREEN WAY EVERETT 4 CORNERS 2025-08-06
>
Address Records
>
EVERGREEN WAY
>
8102
>
EVERETT 4 CORNERS
>
8102 EVERGREEN WAY EVERETT 4 CORNERS 2025-08-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2025 3:42:32 PM
Creation date
7/31/2025 2:38:17 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8102
Tenant Name
EVERETT 4 CORNERS
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1625
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Four Corners Short Plat <br />Stormwater Site Plan <br />■ Activities where there is 100 percent infiltration of surface water runoff within the site in <br />approved and installed erosion and sediment control facilities. <br />Coordination with Utilities and Other Jurisdictions: <br />• Care has been taken to coordinate with utilities, other construction projects, and the local <br />jurisdiction in preparing this SWPPP and scheduling the construction work. <br />Inspection and Monitoring: <br />• All BMPs shall be inspected, maintained, and repaired as needed to assure continued <br />performance of their intended function. Site inspections shall be conducted by a person who is <br />knowledgeable in the principles and practices of erosion and sediment control. This person has the <br />necessary skills to: <br />■ Assess the site conditions and construction activities that could impact the quality of <br />stormwater, and <br />Assess the effectiveness of erosion and sediment control measures used to control the quality <br />of stormwater discharges. <br />• A Certified Erosion and Sediment Control Lead shall be on -site or on -call at all times. <br />• Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP are <br />inadequate, due to the actual discharge of or potential to discharge a significant amount of any <br />pollutant, appropriate BMPs or design changes shall be implemented as soon as possible. <br />Maintaining an Updated Construction SWPPP: <br />• This SWPPP shall be retained on -site or within reasonable access to the site. <br />The SWPPP shall be modified whenever there is a change in the design, construction, operation, <br />or maintenance at the construction site that has, or could have, a significant effect on the <br />discharge of pollutants to waters of the state. <br />The SWPPP shall be modified if, during inspections or investigations conducted by the <br />owner/operator, or the applicable local or state regulatory authority, it is determined that the <br />SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater discharges <br />from the site. The SWPPP shall be modified as necessary to include additional or modified BMPs <br />designed to correct problems identified. Revisions to the SWPPP shall be completed within seven <br />(7) days following the inspection. <br />CPH Project No. 0024-18-042 October 23, 2020 <br />CPIH CONSULTANTS Page 1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.