Laserfiche WebLink
MEMORANDUM <br />TO: Mike Vaughn <br />Heartland Construction <br />FROM: Matthew Schmitter, PE, SE <br />DCG/Watershed <br />DATE: May 20, 2024 <br />RE: Epoxy and FRP Installation <br />Bldg E Four Corners Apartments <br />C. SC�, <br />Ilzl OF WASH.,+' <br />yP F <br />0 <br />37334 <br />Po�ASS"QNAL <br />DCG/Watershed has reviewed the daily installation reports from HayreMcElroy & Associates for the FRP <br />installation and pull testing. Based off these reports, the installation of the FRP reinforcing meets the <br />design requirements for the construction joint repair. <br />It is now acceptable to complete the unit installation, remove the slab shoring and replace the under - <br />slab insulation. <br />Seattle Mount Vernon Whidbey Federal Way Spokane Kirkland <br />9706 4th Ave NE, Ste 300 2210 Riverside Dr, Ste 110 1796 E Main St, Ste 105 31620 23rd Ave S, Ste 307 601 W Main Ave, Ste 617 750 61h St S <br />Seattle, WA 98115 Mount Vernon, WA 98273 Freeland, WA 98249 Federal Way, WA 98003 Spokane, WA 99201 Kirkland, WA 98033 <br />Tel206.523.0024 Tel360.899.1110 Tel360.331.4131 Tel253.237.7770 Tel509.606.3600 Tel425.822.5242 <br />