Laserfiche WebLink
F.3 CONNECT TO IE O N (E)ATF LINE TO F n F.3 n <br /> NEW ATF PUMP AND �,/ Y <br /> TANK.SEE 21M8.4-MB FOR DETAILS <br /> ON PIPE ROUTING. <br /> MODIFY/EXTEND(E)ENGINE OIL CHASSIS GREASE <br /> LINE TO CONNECT TO NEW ENGINE - -CREF�1 - - - <br /> OIL PUMP AND TANK SEE <br /> 21M8.4-MB FOR DETAILS ON PIPE ENGINE OIL SAE 15W-00 DELVAC 1 TF 48"x48"EXHAUST <br /> ROUTING. 1000 GAL 500 GA AIR INTAKE W/1/2" <br /> 112"x48" 60"x467 MESH SCREEN 36x36 3 A ST-1 <br /> BYPASS 3"A;BYPASS 4"A TO <br /> WINDSHIELD WASHER FLUID TRANSITION AIR EQUIPMENT <br /> SEE PIPING 2 n ST-2 <br /> POWER STEERING FLUID DIAGRAM MB A FILTER } <br /> Hd PLUS SAE 8OW-90 <br /> 650GDIESEL,75"X4" 200 0AL <br /> 72"x72"IN850 GAL,75"x46" 43 x34" 3"A � 3"A WITH 72 x72 KE LOUVER <br /> P.O.C.TO NEW WINDSHIELD WASHER FLUID, 3"A 3"A 3" MOTORIZED DAMPER <br /> POWER STEERING FLUID,DIESEL ANTIFREEZE, A 4 A u AND SLEAVE <br /> 8OW-90 GEAR OIL,AND CHASSIS GREASE. M8. RAD-2 `r <br /> DEMOLISH(E)LINES TO THIS POINT. 3"A 3/4"TANKDR0t <br /> AC-1 AC-2 <br /> FD 2 I <br /> Ti-r 3"A- A I I I I — A— . <br /> 10 EO" - OV O <br /> EXISTING DOWN OUT,SEE MECHANICAL EQUIPMENT RAD-1 RAD-1 MECHANICAL EQUIPMENT <br /> 2 5 HOUSEKEEPING PAD,(TYP). HOUSEKEEPING PAD,(TYP). <br /> SEE PIPING 1 ARCH DRAWGS F MODIFICATIONS SEE STRUCTURAL DRAWINGS SEE STRUCTURAL DRAWINGS <br /> DIAGRAMS M8.4 MB M82•MB ST-1 RADA ST•2 FOR SIZES AND CURB DETAILS. FOR SIZES AND CURB DETAILS. <br /> AIR FILTER <br /> AIR FILTER 3"A <br /> B 3"A 33"A 3"A A SECTION B SECTION <br /> M85-MB ___ M8.5•MB SCALE:1/4"=1'-0" MB.�MB SCALE:1/2"=T-0" <br /> TA <br /> AC-2 <br /> 314"DRAIN 72"x72"INTAKE LOUVER <br /> -7- WITH 72"x72" <br /> FD-2 MOTORIZED DAMPER <br /> AND SLEAVE <br /> AC-2 SERVICE <br /> CLEARANCE 36x36 UP TO CREF-1 <br /> 48"x48"EXHAUST TEMPERATURE SENSOR <br /> AIR INTAKE W/1/2" 1 INTERLOCK WITH CREF-1 <br /> MESH SCREEN <br /> 3/4"DRAIN ---: + AC-1 SERVICE <br /> ____I CLEARANCE <br /> AC-1 3!'A <br /> VFD WITH NEMA 1 <br /> UH•1 ENCLOSURE FOR CREF-1 <br /> SEE PIP G 5 <br /> DIAG M <br /> MUM <br /> AIR COMPRESSOR ROOM PLAN <br /> I MB SCALE:114"=T-Y' <br /> NO. DATE REVISION MCOB MAINTENANCE IMPROVEMENTS DRAWN:BSB PROJECT NO.:20.002 <br /> lq)ff "ros - - - DESIGNED:BSB DATE:APRIL 13,2021 <br /> FACILITIES MASTERPLAN PHASE 3A <br /> 7100 HARDESON ROAD,EVERETT WA 98203 CHECKED:LWB ITB#2021.011 <br /> Seat e, Avenue,Suite 1600 IST �. - - - M 8 5-M B <br /> Seattle,WA 98101 REG1711 �`` DRAWING NO.: <br /> 206.622.5822 FSS/ONAU�NpvA ENLARGED PLANS AND SECTIONS Page 250 of 363 <br /> w .kpffxom BOGARD ENGAIFERS,PS - <br />