My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7100 HARDESON RD 2021 Plans 2025-09-11
>
Address Records
>
HARDESON RD
>
7100
>
Plans
>
7100 HARDESON RD 2021 Plans 2025-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 1:44:11 PM
Creation date
8/7/2025 10:38:23 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7100
Permit
M2101-014
Year
2021
Notes
MECHANICAL FOR RENOVATION AND ADDITION - VEHICLE MAINT FAC
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MECHANICAL NOTES PIPING SYMBOLS DUCTWORK SYMBOLS SHEET INDEX ABBREVIATIONS <br /> 1. THE FOLLOWING NOTES APPLY TO ALL MECHANICAL DRAWINGS. �F- BALL VALVE DUCT SECTION-SUPPLY (E) EXISTING <br /> ® M1.1-MB MECHANICAL NOTES,ABBREVIATIONS,SYMBOLS A COMPRESSED AIR <br /> ADDITIONAL MECHANICAL NOTES MAY BE INDICATED ON EACH 6F BALANCING VALVE M1.2-MB MECHANICAL SCHEDULES ADA AMERICANS WITH DISABILITIES ACT <br /> MECHANICAL,PLUMBING AND FIRE PROTECTION DRAWING. �a GATE VALVE DUCT SECTION-RETURN/OSA/EXH. M1.3-MB MECHANICAL SCHEDULES <br /> AFF ABOVE FINISHED FLOOR <br /> 2. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL ry CHECK VALVE 20"x12" RECTANGULAR DUCT(INSIDE DIMENSION) M1.4-MB MECHANICAL SCHEDULES ARCH ARCHITECT/ARCHITECTURAL <br /> CONSTRUCTION INCLUDING LOUVERS,CONCRETE EQUIPMENT PADS, CONTROL VALVE-2 WAY M1.5-MB MECHANICAL SCHEDULES BDD BACKDRAFT DAMPER <br /> FLASHING DETAILS,ETC. 20"0 ROUND DUCT M1.6-MB MECHANICAL SCHEDULES CA COMBUSTION AIR <br /> UNION M1.7-MB MECHANICAL SCHEDULES <br /> 3. MECHANICAL DRAWINGS SHOW APPROXIMATE LOCATIONS FOR GRILLES BUTTERFLY VALVE FLEX CONNECTION M2.1-MB PLUMBING DEMOLITION FOUNDATION PLAN-QUADRANT 1 CD CEILING DIFFUSER <br /> AND DIFFUSERS. REFER TO ARCHITECTURAL REFLECTED CEILING CFM CUBIC FEET PER MINUTE <br /> PLANS AND ELEVATIONS FOR EXACT LOCATIONS. � CONTROL VALVE-3 WAY --L20"x12" LINED DUCT(INSIDE DIMENSION) M2.2-MB PLUMBING DEMOLITION FLOOR PLAN-QUADRANT 1 CG CEILING GRILLE <br /> ® FLEX CONNECTION - M3.1-MB PIPING DEMOLITION PLAN-QUADRANT 1 CL CENTER LINE <br /> 5. ARRANGE HVAC EQUIPMENT SO THAT ACCESS CLEARANCES INDICATED L12"x10° M3.2-MB PIPING DEMOLITION PLAN-QUADRANT 2 <br /> BY DRAWINGS,REQUIRED BY CODES OR RECOMMENDED BY cPa PRESSURE REDUCING VALVE F=_____ LINED DUCT(INSIDE DIMENSION) M3.3-MB PIPING DEMOLITION PLAN-QUADRANT 3 CO CLEANOUT <br /> MANUFACTURER ARE PROVIDED. PRESSURE RELEIF VALVE M3.4-MB PIPING DEMOLITION PLAN-QUADRANT 4 CONT. CONTINUATION <br /> 6. REFER TO PIPING DIAGRAMS AND DETAILS FOR REQUIRED FITTINGS, ���� REDUCED PRESSURE- __(E�20"x20"__ DUCTWORK TO BE DEMOLISHED M4.1-MB HVAC DEMOLITION PLAN-QUADRANT 1 COP COEFFICIENT OF PERFORMANCE <br /> VALVES,ETC. FLOOR PLANS AND SECTIONS INDICATE EQUIPMENT BACKFLOW PREVENTER 90°CONICAL SPIN-IN FITTING M4.2-MB HVAC DEMOLITION PLAN-QUADRANT 2 CW DOMESTIC COLD WATER <br /> DEMO DEMOLSHED ITEM <br /> LOCATIONS AND GENERAL PIPE ROUTING ONLY. PROVIDE PIPING SHOP <br /> THERMOMETER M4.3-MB HVAC DEMOLITION PLAN-QUADRANT 3 DRAWINGS COORDINATED WITH OTHER TRADES. REFER TO SPEC.FOR /��/II III�����11111//// FLEXIBLE DUCT M4.4-MB HVAC DEMOLITION PLAN-QUADRANT 4 DF DRINKING FOUNTAIN <br /> ADDITIONAL SHOP DRAWING REQUIREMENTS. 4 FILTER/REGULATOR DN DOWN <br /> M4.5-MB HVAC AND PLUMBING DEMOLITION ROOF PLAN <br /> TURNING VANE DWG DRAWING <br /> 7. REFER TO ARCHITECTURAL DRAWINGS FOR ROOM ELEVATIONS.LOCATE Q AIR DRYER ' M5.1-MB FOUNDATION PLAN-QUADRANT 1 DWV DOMESTIC WASTE AND VENT <br /> MECHANICAL DEVICES SUCH AS TEMPERATURE SENSORS, PIPE DOWN CEILING DIFFUSER M5.2-MB FOUNDATION PLAN-QUADRANT 3 EA EXHAUST AIR <br /> HUMIDISTATS,PANELS,ETC.SO THAT THEY DO NOT CONFLICT WITH M5.3-MB FOUNDATION PLAN-QUADRANT 4 <br /> GENERAL CONSTRUCTION,LABORATORY EQUIPMENT,OR ELECTRICAL -�0 PIPE UP EAT ENTERING AIR TEMPERATURE <br /> SYSTEM(LIGHT SWITCHES,PANELS,OUTLETS,ETC.). © RETURN/EXHAUST(fRANSFER M5.4-MB PLUMBING FLOOR PLAN-QUADRANT 1 EER ENERGY EFFICIENCY RATING <br /> -� HOSE BIBB/WALL HYDRANT GRILLE OR REGISTER M5.5-MB PLUMBING FLOOR PLAN-QUADRANT 3 <br /> man HOSE DRAIN VALVE VOLUME DAMPER M5.6-MB PLUMBING FLOOR PLAN-QUADRANT 4 EFF EFFICIENCY/EFFICIENT <br /> ELECT. ELECTRICAL <br /> 0 VENT THROUGH ROOF M5.7-MB ENLARGED PLUMBING PLANS <br /> ® FLOOR DRAIN MOTORIZED DAMPER M6.1-MB PIPING PLAN-QUADRANT 1 F FIRE PROTECTION <br /> GENERAL NOTES FCO FLOOR CLEANOUT <br /> u FLOOR SINK COMBINATION SMOKE/FIRE DAMPER M6.2-MB PIPING PLAN-QUADRANT 2 FD FLOOR DRAIN <br /> PROTECT ALL DUCT OPENINGS OF FIRE RATED ASSEMBLIES PER I.B.C.716. CLEAN OUT BACKDRAFT DAMPER M6.3-MB PIPING PLAN-QUADRANT 3 FDR FIRE DAMPER <br /> M6.4-MB PIPING PLAN-QUADRANT 4 FS FLOOR SINK <br /> INSTALL SEISMIC BRACING FOR ALL DUCTWORK,EQUIPMENT AND PIPING WASTE T THERMOSTAT M7.1-MB HVAC FLOOR PLAN-QUADRANT 1 <br /> PER I.B.C.REQUIREMENTS. --------- VENT O FTR FLUE TO ROOF <br /> M7.2-MB HVAC FLOOR PLAN-QUADRANT 2 FV FLUSH VALVE <br /> INSTALL ALL PIPING ON ROOM SIDE OF BUILDING INSULATION. - COLD WATER(DOMESTIC) CO NO2 CO/NO2 SENSOR M7.3-MB HVAC FLOOR PLAN-QUADRANT 3 G NATURAL GAS <br /> -- HOT WATER(DOMESTIC) M7.4-MB HVAC FLOOR PLAN-QUADRANT 4 GA GUAGE <br /> MECHANICAL DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT OS TEMPERATURE SENSOR M7.5-MB HVAC AND PLUMBING ROOF PLAN <br /> PTER <br /> NECESSARILY REFLECT EVERY REQUIRED OFF-SET,FITTING OR ACCESSORY. --- HOT WATER RECIRC.(DOMESTIC) GI GREASE <br /> A COMPRESSED AIR ® WALL SWITCH M7.6-MB ENLARGED HVAC PLANS HW DOMESTICC HOT HOT WATER <br /> THE MECHANICAL CONTRACTOR SHALL VISIT THE JOB SITE PRIOR TO G NATURAL GAS M7.7-MB ENLARGED HVAC PLANS HWC DOMESTIC HOT WATER RECIRC. <br /> BEGINNING WORK IN ORDER TO OBSERVE EXISTING CONDITIONS. VERIFY M8.1-MB MECHANICAL DETAILS AND DIAGRAMS HWH HOT WATER HEATER <br /> EXACT SIZE,LOCATION AND CONDITION OF ALL EXISTING SYSTEMS,DUCTS, D CONDENSATE DRAIN EQUIPMENT M8.2-MB MECHANICAL DETAILS AND DIAGRAMS I.E. INVERT ELEVATION <br /> PIPES,UTILITIES AND BUILDING STRUCTURE. M8.3-MB MECHANICAL DETAILS AND DIAGRAMS <br /> CHS CHILLED WATER SUPPLY IW INDUSTRIAL WASTE <br /> VERIFY VOLTAGES AT THE SITE PRIOR TO ORDERING ANY EQUIPMENT. CHR CHILLED WATER RETURN LR LIQUID REFRIGERANT ® M8.4-MB MECHANICAL DETAILS AND DIAGRAMS L LAVATORY <br /> PUMP(DIAGRAMATIC) M8.5-MB ENLARGED PLANS AND SECTIONS <br /> LAT LEAVING AIR TEMPERATURE <br /> CONTRACTOR SHALL PROVIDE WASTE,VENT,WATER AND GAS PIPING, M8.6-MB ENLARGED PLANS-MULTIZONE UNIT LF LINEAR FOOT <br /> INCLUDING TRAPS,FITTINGS AND STOPS TO COMPLETE EACH EQUIPMENT SR SUCTION REFRIGERANT M8.7-MB MECHANICAL ELEVATIONS&SECTIONS <br /> HOOK-UP TO THE POINT OF FINAL CONNECTION. CONNECTION BETWEEN COIL LR LIQUID REFRIGERANT <br /> VARIOUS PIECES OF EQUIPMENT SHALL BE MADE BY THE PLUMBING RL RAIN LEADER M8.8-MB MECHANICAL ELEVATIONS&SECTIONS <br /> MC MECHANICAL CONTRACTOR <br /> CONTRACTOR AT THE TIME EQUIPMENT IS BEING INSTALLED. ORL OVERFLOW RAIN LEADER M8.9-MB MECHANICAL ELEVATIONS&SECTIONS MECH. MECHANICAL <br /> AIR FILTER M8.10-MB MECHANICAL GAS PIPING DIAGRAMS&CALCULATIONS <br /> TP TRAP PRIMER MOD MOTORIZED DAMPER <br /> ALL MECHANICAL EQUIPMENT LOCATED IN CEILING CAVITIES THAT REQUIRE M9.1-MB FIRE PROTECTION PLAN <br /> ELECTRICAL CONNECTION SHALL HAVE AN 8-1/2"X 11"LAMINATED SIGN TW TEMPERED WATER FAN M9.2-MB PAINT BOOTH ELEVATION NP NON POTABLE <br /> PERMANENTLY MOUNTED ON THE ELECTRICAL ENCLOSURES THAT INDICATES: --- - PIPING TO BE DEMOLISHED OA OUTSIDE AIR <br /> "THIS EQUIPMENT MUST HAVE A MINIMUM ACCESS OF 36"(LESS THAN 460V) F FIRE PROTECTION ORL OVERFLOW RAIN LEADER <br /> AND 42"(460V AND ABOVE)." NO TRADE SHALL BLOCK THIS SPACE EVEN IF OSA OUTSIDE AIR <br /> SHOWN ON THE DRAWINGS. INSTALL SIGN PRIOR TO INSTALLATION OF <br /> P.O.C. POINT OF CONNECTION <br /> EQUIPMENT. <br /> R P. <br /> PRESSURE BACKFLOW PREVENTOR <br /> ALL MECHANICAL EQUIPMENT THAT REQUIRES ACCESS FOR COIL PULL,FILTER <br /> GENERAL SYMBOLS RA RETURN AIR <br /> CHANGE,MOTOR CHANGE,COMPRESSOR CHANGE,LUBRICATION,SHEAVE AND FIG RETURN/RELIEF GRILLE <br /> BELT CHANGE,FAN CHANGE OUT,ETC.SHALL HAVE AN 8-1/2"X 11"LAMINATED PLUMBING EQUIPMENT MARK SECTION REFERENCE RL RAIN LEADER <br /> SIGN PERMANENTLY MOUNTED ON THE EQUIPMENT ACCESS PANELS THAT S SINK <br /> INDICATES"THIS EQUIPMENT MUST HAVE A MINIMUM ACCESS OF 36". NO WC-1 PLUMBING FIXTURE IDENTIFICATION SECTION NUMBER SA SUPPLY AIR <br /> TRADE SHALL BLOCK THIS SPACE." 1 <br /> MECHANICAL EQUIPMENT MARK M2.3 SD SMOKE DETECTOR <br /> DRAWING ON WHICH SENS SENSOR <br /> DEFERRED SUBMITTALS: EF-, EQUIPMENT IDENTIFICATION SECTION IS LOCATED SFD COMBINATION SMOKE/FIRE DAMPER <br /> SG SUPPLY GRILLE <br /> 1.MECHANICAL EQUIPMENT STRUCTURAL CALCULATIONS AIR TERMINAL MARK SR SUCTION REFRIGERANT <br /> 2.ATTACHMENT DETAILS T'STAT THERMOSTAT <br /> REFER TO AIR TERMINAL SCHEDULE TD TRENCH DRAIN <br /> -�__TERMINAL IDENTIFICATION TPP TRAPCAARIMER <br /> 260__DESIGN CFM U.O.N. UNLESS OTHERWISE NOTED <br /> V VENT <br /> DETAIL REFERENCE VA VALVE <br /> DETAIL NUMBER VD VOLUME DAMPER <br /> VTR VENT THROUGH ROOF <br /> M2.3 DRAWING ON WHICH W WASTE <br /> SECTION IS LOCATED WC WATER CLOSET <br /> WCO WALL CLEANOUT <br /> WHA WATER HAMMER ARRESTOR <br /> 6BE p <br /> DATE REVISION MCOB MAINTENANCE IMPROVEMENTS DRAWN:BSB PROJECT NO.:20-002 <br /> 1q)ff <br /> "aQ FACILITIES MASTERPLAN PHASE 3A DESIGNED:BSB DATE:APRIL 13,2021 <br /> 7100 HARDESON ROAD,EVERETT WA 98203 CHECKED:LWB ITS#2021-011 <br /> Seatt e,WA 981015uite 1600 9�RSG,STE ���� DRAWING NO.: <br /> 206.622.6822 SSS/ONALENG` MECHANICAL NOTES, ABBREVIATIONS, SYMBOLS Page 210of363 M 1 . 1 -M B <br /> w .kpff.Gom BOGARD ENGIlVEER6,PS <br />
The URL can be used to link to this page
Your browser does not support the video tag.