My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7100 HARDESON RD 2021 Plans 2025-09-11
>
Address Records
>
HARDESON RD
>
7100
>
Plans
>
7100 HARDESON RD 2021 Plans 2025-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 1:44:11 PM
Creation date
8/7/2025 10:38:23 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7100
Permit
M2101-014
Year
2021
Notes
MECHANICAL FOR RENOVATION AND ADDITION - VEHICLE MAINT FAC
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(36'-o') (36'-0") KEY NOTES <br /> REMOVE AND DISPOSE OF EXISTING AXLE POST LIFTS, <br /> INCLUDING ALL MACHINERY, CONTROLS, HYDRAULIC POWER <br /> PPIINGAND BACKYTOAULIC S STEMIPING. DEMOLISH POINT OF CCONNECTIONRESSENEARDAIR <br /> THE <br /> EXTERIOR WALL. <br /> SEE MD1.3-MB FOR DEMOLITION DETAILS. <br /> I I I <br /> Oi DISCONNECT POWER TO THE HYDRAULIC POWER <br /> UNITS. SHUTOFF AND DISCONNECT THE HYDRAULIC <br /> PIPING TO THE LIFTS. DRAIN REMAINING HYDRAULIC <br /> OIL FROM THE POWER UNITS AND LIFTS, AND <br /> I I DISPOSE OF IN ACCORDANCE WITH THE CONTRACT <br /> IN GROUND LIFT CONTROLS (E), TYP. DOCUMENTS. REMOVE THE POWER UNITS. DEMOLISH <br /> THE HOUSEKEEPING SLABS UNDER THE POWER <br /> UNITS DOWN TO THE LEVEL OF THE FINISHED <br /> FLOOR. <br /> I I I <br /> 20 DISCONNECT ALL HYDRAULIC HOSES, CONTROLS, <br /> AND POSITIONING MACHINERY TO THE (2) MOVABLE <br /> 2 IN GROUND MOVABLE POST AXLE LIFT(E), TYP. LIFTS IN EACH BAY. REMOVE THE MOVABLE LIFTS <br /> I I I BY LIFTING THEM OUT OF THE TRENCHES. REMOVE <br /> ALL ASSOCIATED EQUIPMENT. <br /> O3 DISCONNECT ALL HYDRAULICS AND CONTROLS TO <br /> THE FIXED LIFT IN EACH BAY. REMOVE THE LIFT <br /> I POST FROM THE IN-GROUND BARREL. EVACUATE <br /> AND DISPOSE OF THE REMAINING HYDRAULIC OIL IN <br /> THE BARREL. <br /> 4 REMOVE ALL REMAINING PIPING, CONTROLS, ETC. <br /> ASSOCIATED WITH THE LIFTS. <br /> 2 <br /> 5 SEE SL1.1-MB FOR DETAILS OF SLAB AND <br /> FOUNDATION EXCAVATION AND DEMOLITION. <br /> I I I <br /> 3 IN GROUND FIXED POST AXLE LIFT(E), TYP. <br /> BUS REPA15 <br /> AY <br /> 182 <br /> RUNNING <br /> REPAIR <br /> TICULATE <br /> Q. <br /> 180 <br /> I I I <br /> CONCRETE DEMOLITION EXTENTS, TYP. <br /> SEE SL1.1-MB <br /> I I I <br /> 0 <br /> i <br /> 2 IN GROUND MOVABLE POST AXLE LIFT(E), TYP. <br /> I I I <br /> IN GROUND LIFT CONTROLS (E), TYP <br /> I I I <br /> 1 (E) HYDRAULIC POWER UNIT, 2 PLACES <br /> 0 4 8 12 16 <br /> I I I <br /> BAY 5 BAY 4 BAY 3 BAY 2 BAY 1 SCALE IN FEET <br /> 3/16" = 1'-0" <br /> G N NO. DATE REVISION KEY PLAN '" MCOB MAINTENANCE IMPROVEMENTS DRAWN: RB PROJECT NO.:20-002 <br /> 1 s q <br /> 1,eaeco 11 2 FACILITIES MASTERPLAN PHASE 3A <br /> a°� LEI DESIGNED: PGH DATE: APRIL 13,2021 <br /> INTE""NCE 7100 HARDESON ROAD,EVERETT WA 98203 CHECKED: DWH IT3#2021-011 <br /> q)ff <br /> 1601 5th Avenue,Suite 1600 A 35430 <br /> ''�0 4Ctarta DRAWINGNO.: R <br /> Seattle,WA 98101 „ORAL MECHANICAL DEMOLITION <br /> FLOOR PLAN M D 1 . 1 �M V <br /> 206.622.6822 i�/��y:;L BAYS 1, 2, 3, Y Page 258 of 363 <br /> -kpff.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.