Laserfiche WebLink
BAY 14 BAY 15 BAY 16 BAY 17 BAY 18 KEY NOTES <br /> REMOVE AND DISPOSE OF EXISTING AXLE POST LIFTS, <br /> 4 INCLUDING ALL MACHINERY, CONTROLS, HYDRAULIC POWER <br /> UNIT, AND HYDRAULIC PIPING. DEMOLISH COMPRESSED AIR <br /> PIPING BACK TO SYSTEM POINT OF CONNECTION NEAR THE <br /> EXTERIOR WALL. <br /> I SEE MD1.3-MB FOR DEMOLITION DETAILS. <br /> I I <br /> Oi DISCONNECT POWER TO THE HYDRAULIC POWER <br /> UNITS. SHUTOFF AND DISCONNECT THE HYDRAULIC <br /> 1 PIPING TO THE LIFTS. DRAIN REMAINING HYDRAULIC <br /> OIL FROM THE POWER UNITS AND LIFTS, AND <br /> DISPOSE OF IN ACCORDANCE WITH THE CONTRACT <br /> DOCUMENTS. REMOVE THE POWER UNITS. DEMOLISH <br /> 1 (E) HYDRAULIC POWER UNIT, 2 PLACES THE HOUSEKEEPING SLABS UNDER THE POWER UNITS <br /> DOWN TO THE LEVEL OF THE FINISHED FLOOR. <br /> I <br /> - O2 DISCONNECT ALL HYDRAULIC HOSES, CONTROLS, AND <br /> IN GROUND LIFT CONTROLS (E), TYP. POSITIONING MACHINERY TO THE (2) MOVABLE LIFTS <br /> IN EACH BAY. REMOVE THE MOVABLE LIFTS BY <br /> LIFTING THEM OUT OF THE TRENCHES. REMOVE ALL <br /> I IRUNNING ASSOCIATED EQUIPMENT. <br /> c EPAIR <br /> (S ANDARD) O3 DISCONNECT ALL HYDRAULICS AND CONTROLS TO <br /> I81 THE FIXED LIFT IN EACH BAY. REMOVE THE LIFT <br /> POST FROM THE IN-GROUND BARREL. EVACUATE <br /> S REP"I THE 2 IN GROUND MOVABLE POST AXLE LIFT (E), TYP. AND DISPOSE OF THE REMAINING HYDRAULIC OIL IN <br /> BAY THE BARREL. <br /> 183 <br /> 4 REMOVE ALL REMAINING PIPING, CONTROLS, ETC. <br /> CONCRETE DEMOLITION EXTENTS, TYP. ASSOCIATED WITH THE LIFTS. <br /> SEE SL1.1-MB <br /> 5 SEE SL1.1-MB FOR DETAILS OF SLAB AND <br /> FOUNDATION EXCAVATION AND DEMOLITION. <br /> I <br /> I I I I <br /> I I I I <br /> 3 IN GROUND FIXED POST AXLE LIFT(E), TYP. <br /> 3 — — <br /> I <br /> I I I I <br /> T I <br /> I I I I <br /> I I I I <br /> 0 <br /> I <br /> in <br /> M <br /> I <br /> I I I I <br /> I I I I <br /> H G F.3 0 4 8 12 16 <br /> SCALE IN FEET <br /> 3/16" = 1'-0" <br /> NO DATE REVISION KEY PLAN MCOB MAINTENANCE IMPROVEMENTS DRAWN: RB PROJECT NO.:20-002 <br /> �1p <br /> 10 � FACILITIES MASTERPLAN PHASE 3A DESIGNED: PGH DATE: APRIL13,202, <br /> 7100 HARDESON ROAD,EVERETT WA 98203 CHECKED: DWH ITB#2021-011 <br /> 16015th Avenue,Suite 1800 e �� MECHANICAL DEMOLITION FLOOR PLAN DRAWING NO.: <br /> Seattle,.6822 WA 1 �ogsL M D 1 .2—M B <br /> 206.622.6g22 y/y/z,�. BAYS 15, 16, 17, 18 Page 259 of 363 <br /> v+ww.kpff.com <br />