DETAIL - TYPICAL REMOVAL
<br /> OF HYDRAULIC POWER UNIT NOTES
<br /> + 1 DISCONNECT POWER FROM THE HPU. CLOSE ALL VALVES. REMOVE THE HYDRAULIC OIL 1. THE EXISTING LIFTS ARE OBSOLETE, LOW PRESSURE, HIGH VOLUME POST LIFTS. THE LIFTS ARE OBSOLETE TECHNOLOGY AND HAVE REACHED THE END OF THEIR
<br /> FROM THE HPU AND DISPOSE OF IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. USEFUL LIVES. LIFTS ARE TO BE REPLACED WITH STERTIL-KONI LIFTS (OFOI). SEE STERTIL-KONI DRAWINGS FOR DETAILS.
<br /> 2 DISCONNECT THE PIPING TO THE TWO (2) LIFTS SERVED BY THE HPU. 2. DISCONNECT AND REMOVE THE FOUR (4) EXISTING HYDRAULIC POWER UNITS. DISPOSE OF IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
<br /> - -- 3 REMOVE AND DISPOSE OF THE HPU. 3. REMOVE ALL PIPING ASSOCIATED WITH THE EXISTING LIFTS.
<br /> ® PER SHEETS MD1.1-MB AND MD1.2-MB, DISCONNECT AND REMOVE THE EXISTING LIFTS, 4. REMOVE ALL MACHINERY, EQUIPMENT, COVERS, GUARDS, CONTROLS, ETC ASSOCIATED WITH THE EXISTING LIFTS INCLUDING THE CONTROL PANELS EMBEDDED IN THE
<br /> INCLUDING ALL PIPING. FLOOR.
<br /> CUT OFF THE PVC CONDUITS AT FLOOR LEVEL SEAL WITH GROUT 5. DEMOLISH THE EXISTING FOUNDATIONS PER THE STRUCTURAL DEMOLITION PLAN, SL1.1-MB AND S1-1.2-MB.
<br /> © DEMOLISH THE HOUSEKEEPING PAD TO THE FLOOR LEVEL. USE EPDXY GROUT, PER 6. FILL ALL REMAINING FOUNDATIONS WITH COMPACTED SAND AND ABANDON IN PLACE.
<br /> ARCHITECTURAL SPECIFICATIONS, TO REPAIR AND LEVEL THE FLOOR.
<br /> 7. GENERAL DECOMMISSIONING PROCEDURE
<br /> EXISTING CONDITIONS
<br /> EACH OF THE EIGHT(8) EXISTING LIFTS CONSISTS OF A SINGLE FIXED LIFT AND ONE OR TWO MOVABLE LIFTS. THE FIXED LIFTS ARE DIRECT BURIED
<br /> S x CYLINDERS THAT REST ON THRUST BLOCKS APPROXIMATELY 9' BELOW THE FINISHED FLOOR. THE MOVABLE LIFTS TRAVEL ON CARRIAGES ALONG THE TOP
<br /> EDGES OF A NARROW FOUNDATION BOX THAT IS APPROXIMATELY 20"WIDE AND 9' DEEP.
<br /> THE LIFTS ARE OPERATED BY FOUR (4) HYDRAULIC POWER UNITS, 2 LIFTS PER HPU, THAT ARE INSTALLED ALONG THE NORTH AND SOUTH WALLS OF THE
<br /> MAINTENANCE BAY. THE HYDRAULIC OIL IS ROUTED TO THE LIFTS THROUGH PIPING ROUTED BENEATH THE FLOOR.
<br /> 6 PLANNED RENOVATION
<br /> THE EXISTING LIFTS ARE TO BE DECOMMISSIONED AND REMOVED, AND REPLACED BY MORE MODERN SCISSOR STYLE VEHICLE LIFTS. THE NEW LIFTS ARE
<br /> 5 COMPACT WHEN RETRACTED, AND THE FOUNDATIONS ARE APPROXIMATELY 3'-6"DEEP.
<br /> CHALLENGES
<br /> IT IS IMPRACTICAL TO FULLY EXCAVATE AND REMOVE THE FOUNDATIONS OF THE EXISTING LIFTS. FIRST, THE EXCAVATIONS WOULD NEED TO BE
<br /> APPROXIMATELY 10' DEEP, WHICH WILL BE DIFFICULT WITHIN THE CONFINES OF THE EXISTING BUILDING, AND COULD POTENTIALLY IMPACT THE STRUCTURAL
<br /> 4 INTEGRITY OF THE EXISTING BUILDING. SECOND, OILS AND OTHER CONTAMINANTS THAT ARE CURRENTLY CONTAINED WITHIN THE EXISTING FOUNDATIONS
<br /> COULD BE RELEASED INTO THE SURROUNDING SOILS.
<br /> 1'-4" FIELD VERIFY VARIES
<br /> REMEDY
<br /> IN ORDER TO ALLEVIATE THE CHALLENGES OUTLINED ABOVE, IT IS SAFER AND MORE ECONOMICAL TO ONLY EXCAVATE TO THE DEPTH REQUIRED FOR THE
<br /> NEW LIFTS. THE EXPOSED PORTIIONS OF THE EXISTING FOUNDA11ONS WILL BE DEMOLISHED AND REMOVED, BUT THE REMAINING LOWER PORTIONS OF THE
<br /> FOUNDATIONS WILL BE FILLED WITH COMPACTED FILL MATERIAL AND ABANDONED IN PLACE.
<br /> 4 4
<br /> PROCESS
<br /> IN ORDER TO DECOMMISSION THE LIFTS IN THE SAFEST AND MOST EFFECTIVE MANNER, THE FOLLOWING GENERAL PROCESS SHALL BE USED. WHEN
<br /> ° DISMANTLING HYDRAULIC LINES AND FITTINGS, CAPTURE AS MUCH OIL AS POSSIBLE TO ALLEVIATE LATER CLEAN UP.
<br /> 00 � 1. CLOSE THE MANUAL VALVES ON THE HYDRAULIC LINES TO ISOLATE THE LIFTS.
<br /> 'v
<br /> w 2. AT THE LIFT CONTROL VALVES (ON THE FLOOR), BREAK THE LINES TO THE LIFTS AND DRAIN OIL. OTHER ACCESSIBLE LOCATIONS FOR THE PIPING
<br /> x 5 COMPACTED SAND FILL MAY BE UTILIZED.
<br /> 3 w 0 3. FOR EACH MOVABLE LIFT
<br /> a , a. REMOVE THE PIT COVER PLATES CLOSEST TO THE LIFT
<br /> a w b. DISCONNECT THE FLEXIBLE HOSES AT THE LIFT PISTON AND AT THE LATERAL DRIVE MOTOR AND PLUG OR CAP THE HOSES AND THE
<br /> o FITTINGS
<br /> 5 9 C. DISMANTLE THE LATERAL DRIVE CHAINS, AND REMOVE THE LATERAL DRIVE MOTOR AND HARDWARE
<br /> d. SECURE THE CYLINDER FOR LIFTING, THEN REMOVE THE CARRIAGE WHEELS/AXLES
<br /> o e. REMOVE THE CYLINDER. BE AWARE THAT THE CYLINDER WILL STILL BE FULL OF OIL, AND MUST BE EMPTIED PRIOR TO DISPOSAL
<br /> i f. REMOVE ANY REMAINING HARDWARE AND COMPONENTS
<br /> 00 a 4. FOR THE FIXED LIFTS
<br /> °s °° a. RAISE THE LIFT HIGH ENOUGH TO ACCESS THE SAFETY LEG
<br /> o ° b. SECURE THE SAFETY LEG, AND THEN UNBOLT IT FROM THE LIFT BOLSTER
<br /> C. RAISE THE LIFT UP AND REMOVE IT FROM THE BURIED BARREL. NOTE THAT THE LIFT NEEDS TO BE ROTATED TO UNLOCK IT FROM THE
<br /> m
<br /> BARREL
<br /> d. DISCARD THE LIFT POST AND THE SAFETY LEG
<br /> °
<br /> ° ° e. REMOVE THE LOCK MECHANISM AND ANY OTHER HARDWARE
<br /> ° f. REMOVE THE REMAINING OIL IN THE BARREL
<br /> 5. GENERAL
<br /> a. AFTER THE LIFTS HAVE BEEN REMOVED, DRAIN AND REMOVE ACCESSIBLE PIPING AND HOSES
<br /> b. DISCONNECT AND DRAIN THE HYDRAULIC POWER UNIT, THEN REMOVE THE POWER UNIT
<br /> C. COLLECT AND REMOVE ANY OIL OR REMAINING IN THE
<br /> DETAIL - TYPICAL CLOSURE d. ONCE ALL ACCESSIBLE PORTIONS OFO THE RLFTTNTAMINANTS HAVE BEEN REMOVED, DEMOLSHIFTHEIFSOOR AND FOUNDATIONS ACCORDING TO THE
<br /> OF EXISTING FOUNDATIONS STRUCTURAL DURING
<br /> DEMOL1 PLAN
<br /> e. DURING DEMOLITION OF THE FLOOR SLAB AND FOUNDATIONS, DEMOLISH THE HOUSEKEEPING PEDESTAL UNDER THE POWER UNIT
<br /> f. ONCE THE FLOOR AND FOUNDATION DEMOLITION IS COMPLETE, GROUT SEAL ANY DRAINS, CRACKS, OR OTHER HOLES IN THE REMAINING
<br /> 1 REMOVE ALL LIFT EQUIPMENT AS SHOWN IN SHEETS MD1.1-MB AND MD1.2-MB FOUNDATIONS
<br /> 2 REMOVE ALL DEBRIS, DIRT, AND EXCESS OIL AND DISPOSE OF IN ACCORDANCE WITH THE SECg. FILL THE VOIDS IN THE REMAINING PORTIONS OF THE PITS AND THE FIXED LIFT BARREL WITH COMPACTABLE FILL OR SAND. THESE
<br /> TIONS WILL BE ABANDONED IN PLACE
<br /> CONTRACT DOCUMENTS.
<br /> ALL USED HYDRAULIC OIL AND OTHER CONTAMINANTS SHALL BE DISPOSED OF IN AN ENVIRONMENTALLY RESPONSIBLE MANNER AND IN
<br /> O3 REMOVE THE STEEL BOX IN THE MOVABLE LIFT TRENCHES ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS. ALL METALS, HARDWARE, AND COMPONENTS SHALL BE RECYCLED IN ACCORDANCE
<br /> ® SEE SHEET SL1.1 FOR LIMITS OF SLAB AND FOUNDATION DEMOLITION WITH THE CONTRACT DOCUMENTS.
<br /> CONCRETE SHALL BE DEMOLISHED TO A DEPTH OF APPROXIMATELY 4'-8" BELOW FINISHED
<br /> FLOOR,
<br /> SO REMAINING FOUNDATIONS BELOW THIS LEVEL SHALL BE FILLED WITH COMPACTED SAND AND
<br /> ABANDONED IN PLACE.
<br /> NO. DATE REVISION KEY PLAN MCOB MAINTENANCE IMPROVEMENTS DRAWN: RB PROJECT NO.:20-002
<br /> l R'
<br /> �:°°'"'�'���� FACILITIES MASTERPLAN PHASE 3A DESIGNED: PGH DATE: APRIL13,2021
<br /> yfi�
<br /> ""'"—°E 7100 HARDESON ROAD,EVERETT WA 98203 CHECKED: DWH ITB#2021-011
<br /> 1e016th A9B1,Suite7600 964so�, MECHANICAL DEMOLITION DETAILS DRAWING Seattle,WA 1 �� M D 1 .3-M B
<br /> 206.622.6e22 y �:�, AND SAFE CLOSURE Page 260 of 363
<br /> www.kpff.00m
<br />
|