Laserfiche WebLink
10'-0" g_p• LUBE HOSE SUPPORT TOWERS <br /> KEY NOTES <br /> SEE SHEET A9.02-MB, DETAILS C4 AND C5 9'-0" O1 CONTRACTOR TO CONNECT COMPRESSED AIR SUPPLY TO NEW <br /> FOR DETAILS AND ADDITIONAL INFORMATION CONTROL CONSOLE (BY OTHERS). CONTRACTOR TO INSTALL FRL <br /> LOCATIONS APPROXIMATE <br /> FIELD LOCATE UNIT AT NEW CONSOLE. SEE SHEET M5.2-MB FOR DETAILS. <br /> CONTRACTOR TO CONNECT SUMP PUMP IW DISCHARGE WITH <br /> ® EXISTING IW TRENCH DRAIN NEAR BAY DOOR, BAY 10 ONLY <br /> To <br /> SEE SHEET M5.2-MB FOR DETAILS. <br /> 26 CONTRACTOR TO CONNECT SUMP PUMP IW DISCHARGE TO NEW IW <br /> MOVABLE LIFT 13'-0" LINE. SEE BUILDING MECHANICAL SHEETS FOR DETAILS. BAYS <br /> TRAVEL RANGE 11 AND 12 SEE SHEET M5.2-MB FOR DETAILS. <br /> - O NEW LIFT CONTROL CONSOLE FROM STERTIL KONI SHALL BE <br /> SUPPLIED AND INSTALLED BY OWNER. BACK SIDE OF THE <br /> CONSOLE SHALL FACE THE CENTER LINE OF THE BUILDING SO <br /> - - - - - _ THAT OPERATOR IS FACING NORTH WHILE OPERATING THE LIFT. <br /> ® CONTRACTOR TO INSTALL 4" PVC CONDUIT CHASES FOR <br /> HYDRAULIC LINES, PIPE INVERT 20" BELOW FINISHED FLOOR. <br /> CONNECT HYDRAULIC LINES PER MFR INSTRUCTIONS. 16" MIN <br /> BEND RADIUS. <br /> O5 CONTRACTOR TO INSTALL 3/4" RMC FOR INTRINSICALLY SAFE <br /> c� 6 INCLINOMETERS, IN ACCORDANCE WITH STERTIL-KONI INSTALLATION <br /> z <br /> DRAWINGS. <br /> a <br /> © LIFTS SHALL BE INSTALLED BY OWNER PER LIFT MANUFACTURER'S <br /> 4 INSTRUCTIONS, SEE STRUCTURAL DRAWINGS FOR LIFT PIT DETAILS. <br /> • rn 7 5 O7 SUMP WITH AODD PNEUMATIC PUMP CONTROLLED BY PNEUMATIC <br /> LIQUID LEVEL SENSOR. PUMP SUPPLIED AND INSTALLED BY <br /> OWNER. <br /> -- c �c c <br /> FIXED CENTER LIFT GENERAL NOTES <br /> X v23m 1. CONDUITS®Q AND SUMPQ LOCATIONS ARE FOR <br /> REFERENCE ONLY. CONTRACTOR SHALL VERIFY LOCATION WITH <br /> c STERTIL KONI LAYOUT DRAWINGS CREATED SPECIFICALLY FOR <br /> THIS PROJECT. <br /> -- in <br /> 111 <br /> z._ <br /> _ <br /> N <br /> MOVABLE LIFT 17'-0" <br /> c' TRAVEL RANGE <br /> � I I <br /> iv I <br /> I I I <br /> iV <br /> (V <br /> 4 <br /> 5 <br /> f I 3 f <br /> � N N <br /> - - - - - <br /> - �HB _ <br /> I I I I <br /> - vz] - <br /> O 28 1 p O N <br /> 7-3" 7'- " 7'-3" HB <br /> 20'-0" 9'-11" 0 V-10" <br /> 0 4 8 12 <br /> CL BAY 12 CL BAY 11 CL BAY 10 SCALE IN FEET <br /> N M 1 FLOOR &,FOUNDATION PLAN <br /> G• Aq NO, DATE REVISION KEY PLAN MCOB MAINTENANCE IMPROVEMENTS DRAWN: RE PROJECT NO.:20-002 <br /> 1 e;b °Psi 2 FACILITIES MASTERPLAN PHASE 3A <br /> a ' DESIGNED: PGH DATE: APRIL 13,2021 <br /> """ """°` 7100 HARDESON ROAD,EVERETT WA 98203 CHECKED: DWH ITB#2021-011 <br /> 16015th Avenue,Suite 1600 RBCIagE <br /> Seattle,WA 98101 MECHANICAL INSTALLATION PLAN DRAWING NO.: <br /> www.kpff.com �°NAL M L2 . -M V <br /> - �3 � <br /> 206.622.6822 H� � BAYS 10, 11, 12 <br /> Page 266 of 363 <br />