Laserfiche WebLink
CL BAY 18 CL BAY 19 CL BAY 20 <br /> N 9'-11" 20' 9'-11" M 15' <br /> KEY NOTES <br /> 7'-3" 7, 3, <br /> p 2B 1 2g O O 2A O O O1 CONTRACTOR TO CONNECT COMPRESSED AIR SUPPLY TO NEW <br /> c CONTROL CONSOLE (BY OTHERS). CONTRACTOR TO INSTALL FRL <br /> UNIT AT NEW CONSOLE. SEE SHEET M5.1-MB FOR DETAILS. <br /> N N 2A CONTRACTOR TO CONNECT SUMP PUMP IW DISCHARGE WITH <br /> EXISTING IW TRENCH DRAIN NEAR BAY DOOR, BAY 20 ONLY. <br /> SEE SHEET M5.1-MB FOR DETAILS. <br /> 0 <br /> CONTRACTO <br /> TO CONNECT SUMP PUMP IW <br /> 26 RBUIILDING DISCHARGE MECHANICAL S EETS FORDETAILS. BAY <br /> LINE. SEE EW IW <br /> 18 AND 19 <br /> SEE SHEET M5.1-MB FOR DETAILS. <br /> � 5 I 3 <br /> NEW LIFT CONTROL CONSOLE FROM STERTIL KONI SHALL BE <br /> SUPPLIED AND INSTALLED BY OWNER. BACK SIDE OF THE <br /> CONSOLE SHALL FACE THE CENTER LINE OF THE BUILDING SO <br /> THAT OPERATOR IS FACING SOUTH WHILE OPERATING THE LIFT. <br /> MOVABLE LIFT 17'-0" <br /> TRAVEL RANGE CONTRACTOR SHALL INSTALL 4" PVC CONDUIT CHASES FOR <br /> __ ® HYDRAULIC AND PNEUMATIC LINES, IN ACCORDANCE WITH <br /> STERTIL-KONI INSTALLATION DRAWINGS. PIPE INVERT TO BE 20" <br /> I I I BELOW FINISHED FLOOR. CONDUIT BENDS SHALL BE 16" MIN <br /> HB BEND RADIUS. <br /> CONTRACTOR TO INSTALL 3/4" RMC FOR INTRINSICALLY SAFE <br /> O INCLINOMETERS, IN ACCORDANCE WITH STERTIL-KONI INSTALLATION <br /> DRAWINGS. <br /> z LIFTS SHALL BE INSTALLED BY OWNER PER LIFT MANUFACTURER'S <br /> © INSTRUCTIONS, SEE STRUCTURAL DRAWINGS FOR LIFT PIT DETAILS. <br /> N <br /> 5 SUMP WITH AODD PNEUMATIC PUMP CONTROLLED BY PNEUMATIC <br /> 4 O QUID LEVEL SENSOR. PUMP SUPPLIED AND INSTALLED BY <br /> N <br /> FIXED CENTER LIFT <br /> a <br /> I <br /> GENERAL NOTES <br /> x <br /> 1. CONDUITS®� AND SUMPO7 LOCATIONS ARE FOR <br /> c c REFERENCE ONL . AND <br /> SHALL VERIFY LOCATION WITH <br /> 0 5 0 0 STERTIL KONI LAYOUT DRAWINGS CREATED SPECIFICALLY FOR <br /> I <br /> N THIS PROJECT. <br /> � 4 <br /> v � 7 <br /> Q <br /> J� <br /> V <br /> io <br /> I <br /> m 6 <br /> I <br /> � [V <br /> MOVABLE LIFT 13'-0" <br /> TRAVEL RANGE LURE HOSE SUPPORT TOWERS <br /> V L f <br /> SEE SHEET A9.02-MB, DETAILS <br /> C4 AND C5 FOR DETAILS AND <br /> ITION INFORMATION <br /> LOCDAT ONS APPROXIMATE <br /> 10'-0" 8'-0" FIELD LOCATE 9'-0" N <br /> 1 FLOOR & FOUNDATION PLAN SCALE IN FEET <br /> - SCALE: 1/4" = 1'-0" 1/4" = 1'-0" <br /> NO. DATE REVISION KEY PLAN MCOB MAINTENANCE IMPROVEMENTS DRAWN: RB PROJECT NO,:20-002 <br /> ti ua WAS <br /> 4�°'�"r;;� A,"iE"3"LF , ,' FACILITIES MASTERPLAN PHASE 3A DESIGNED: PGH DATE: APRIL13,2021 <br /> 1q)ff7100 HARDESON ROAD,EVERETT WA 98203 CHECKED: DWH ITB#2021-011 <br /> 56015th Avenue,Suite 1600 �o "�N <br /> 15 <br /> Seattle,WA 98501 fO6e6 3A MECHANICAL INSTALLATION PLAN DRAWING NO: <br /> �"s �� [l <br /> 206.622.5822 SA4 BAYS 18, 19, 20 Page 267of363 M L2 .—Apff.com <br />