My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3121 TULALIP AVE 2026-02-05
>
Address Records
>
TULALIP AVE
>
3121
>
3121 TULALIP AVE 2026-02-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2026 9:36:45 AM
Creation date
8/8/2025 11:02:28 AM
Metadata
Fields
Template:
Address Document
Street Name
TULALIP AVE
Street Number
3121
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation NGA File No. 959616 <br /> Watson Residence Addition July 6,2016 <br /> Everett,Washington Page 10 <br /> areas at depths of approximately one to two below the existing ground surface. If undocumented fill or <br /> less dense soils are encountered at footing bearing elevation, the subgrade should be over-excavated to <br /> expose suitable bearing soil. The over-excavation may be filled with structural fill, or the footing may be <br /> extended down to the competent native soils. If footings are supported on structural fill, the fill zone <br /> should extend outside the edges of the footing a distance equal to one half of the depth of the over- <br /> excavation below the bottom of the footing. <br /> Footings should extend at least 18 inches below the lowest adjacent finished ground surface for frost <br /> protection and bearing capacity considerations. Foundations should be designed in accordance with the <br /> 2012 IBC. Footing widths should be based on the anticipated loads and allowable soil bearing pressure. <br /> Water should not be allowed to accumulate in footing trenches. All loose or disturbed soil should be <br /> removed from the foundation excavation prior to placing concrete. <br /> For foundations constructed as outlined above, we recommend an allowable design bearing pressure of <br /> not more than 2,000 psf be used for the design of footings founded on the medium dense or better native <br /> soils or structural fill extending to the competent native material. The foundation bearing soil should be <br /> evaluated by a representative of NGA. We should be consulted if higher bearing pressures are needed. <br /> Current IBC guidelines should be used when considering increased allowable bearing pressure for short- <br /> term transitory wind or seismic loads. Potential foundation settlement using the recommended allowable <br /> bearing pressure is estimated to be less than 1-inch total and Y2-inch differential between adjacent <br /> footings or across a distance of about 20 feet,based on our experience with similar projects. <br /> Lateral loads may be resisted by friction on the base of the footing and passive resistance against the <br /> subsurface portions of the foundation. A coefficient of friction of 0.35 may be used to calculate the base <br /> friction and should be applied to the vertical dead load only. Passive resistance may be calculated as a <br /> triangular equivalent fluid pressure distribution. An equivalent fluid density of 200 pounds per cubic <br /> foot (pcf) should be used for passive resistance design for a level ground surface adjacent to the footing. <br /> This level surface should extend a distance equal to at least three times the footing depth. These <br /> recommended values incorporate safety factors of 1.5 and 2.0 applied to the estimated ultimate values for <br /> frictional and passive resistance, respectively. To achieve this value of passive resistance, the <br /> foundations should be poured "neat" against the native medium dense soils or compacted fill should be <br /> used as backfill against the front of the footing. We recommend that the upper one foot of soil be <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.