Laserfiche WebLink
and upstream flows that affect the subject property and that, in combination with <br />proposed grade changes, would result in the need to manage stormwater for the <br />protection of proposed and existing development. All runoff from new impervious <br />surfaces would be collected, detained, treated, and discharged to the municipal <br />stormwater system, as ensured through review for compliance with applicable City <br />regulations during the civil engineering phase of development. Findings 17, 20, 24, 31, <br />32, 33, 34, 35, and 36. <br />7. The proposal's common open space in 'Tract 999 and along the drive aisle in Tract 998 <br />would be accessible to residents in all units by the internal access road. The quantity of <br />proposed common open space exceeds the 2,500 square foot minimum required and <br />would be maintained by a homeowners association, satisfying EMC 19.09.050. The <br />provision of adequately sized and dimensioned private open space for each unit would be <br />reviewed and ensured through building permit processes. Findings 6, 23, and 36. <br />Review by various City departments indicates that adequate provision can be made for all <br />required public facilities and services. The municipal water and sewer service both have <br />capacity to serve the project from existing mains'in W. Mukilteo Boulevard. Preliminary <br />review by the Fire Department indicated that the project is capable of complying with <br />applicable provisions of the fire code. Review for technical compliance with all <br />applicable standards would occur through the civil engineering and building permit <br />processes. The site's frontage would be improved to be consistent with local street <br />standards as determined by the City Engineer and would be connected to sidewalks along <br />the internal drive aisle. The proposed private internal road would provide access to all <br />lots in accordance with private access standard C. All deeds, dedications, and other <br />easements would be reviewed at time of permit review and easement language would be <br />required on the final plat map. The project is projected to generate eight new PM peak <br />hour trips, which can easily be accommodated by the existing road network. Addressing <br />transportation related concerns, the School District requested curb, gutter, and sidewalk <br />along the site's frontage and no other amenities; however, City Staff testified that <br />additional communication with the District would confirm whether or not crosswalk or <br />other improvements are required to provide safe access to the currently existing school <br />bus stop across the street from the site. School, traffic, and park impacts would be <br />mitigated through payment of impact fees consistent with ordinance. All common <br />facilities including the open space, roads, stormwater facilities, guest parking, and <br />landscaping would be accessible to residents of the project and maintained by a <br />homeowners association. Findings 6, 10, 11, 13, 14, 16, 17, 22, 23, 24, 31, 32, 33, 34, <br />35, and 36. <br />9. The record contains no evidence that would support a conclusion of adverse impact to <br />existing public services. Neither Fire nor Police submitted comments indicating capacity <br />or other concerns, and review for compliance with applicable Fire Code providing is <br />addressed above. In addition to the provision of on -site open space with amenities, the <br />project would be required to pay park impact fees at the time of building permit <br />Everett Hearing Examhie• <br />Findhrgs, Conchrsionv, rend Decision <br />Sage Horses Northwest LLC (RE, VII22-001) <br />page 20 of 22 <br />