My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3620 W MUKILTEO BLVD Geotech Report 2025-08-13
>
Address Records
>
W MUKILTEO BLVD
>
3620
>
Geotech Report
>
3620 W MUKILTEO BLVD Geotech Report 2025-08-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 9:20:08 AM
Creation date
8/13/2025 9:19:57 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3620
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation <br /> Mukilteo Boulevard Development <br /> Everett,Washington <br /> March 31,2003 <br /> NGA File No.366503 <br /> Page 8 <br /> for importing all-weather material for fill,which could significantly raise earthwork costs. We therefore <br /> recommend that earthwork be conducted during the drier summer months. Even during the summer time, <br /> great care should be taken not to disturb wet subgrades under construction traffic. Surface water should <br /> be diverted around areas to be excavated. <br /> If earthwork is to be accomplished during wet weather, we recommend that a blanket of rock spans be <br /> placed in the planned access roadway. The thickness of the spall blanket should be based on soil <br /> conditions at the time the site is developed,and the performance under heavy equipment. We recommend <br /> using a minimum of a 1-foot thickness of spans in traffic areas for estimating additional wet weather <br /> costs. Wet weather construction may require increased overexcavation of wet material and importing all- <br /> Weather material for fill. <br /> Level benches a minimum of 4 feet in width should be created on ground inclining steeper than 20 <br /> percent that will receive fill. The benches should help key the new fill into the native material and reduce <br /> sliding potential. The level benches could be created as the fill is being placed: <br /> Temporary and Permanent Slopes <br /> Temporary cuts of up to 12 feet are anticipated for basement walls and detention vault construction. <br /> Temporary excavation stability is a function of many factors, such as the type and consistency of soils, <br /> depth of the cut, surcharge loads adjacent to the excavation, length of time a cut remains open, and the <br /> presence of surface or ground water. It is exceedingly difficult under these variable conditions to estimate <br /> a stable, temporary, cut-slope geometry. Therefore, it should be the responsibility of the contractor to <br /> maintain safe slope configurations, since the contractor is continuously at the job site,able to observe the <br /> nature and condition of the cut slopes, and able to monitor the subsurface materials and ground water <br /> conditions encountered. <br /> This information is provided soley for the benefit of the owner and other design consultants and should <br /> not be construed to imply that Nelson Geotechnical Associates Inc., assumes responsibility for job site <br /> safety. Job site safety is the sole responsibility of the project contractor. <br /> For planning purposes, we recommend that temporary cuts in the on-site soils be no steeper than 1.5 <br /> Horizontal :1 Vertical (1.5H:1V). If these inclinations are not feasible due to the proximity to existing <br /> NELSON GEOTECHNICAL ASSOCIATES INC <br /> EXHIBIT # L� <br /> PAGER OF2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.