My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3702 W MUKILTEO BLVD HARBORS EDGE TOWNHOMES 2025-08-13
>
Address Records
>
W MUKILTEO BLVD
>
3702
>
HARBORS EDGE TOWNHOMES
>
3702 W MUKILTEO BLVD HARBORS EDGE TOWNHOMES 2025-08-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 1:17:43 PM
Creation date
8/13/2025 1:14:10 PM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3702
Tenant Name
HARBORS EDGE TOWNHOMES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
submitted plan set shows what appears to be an at least five-foot wide apparent path <br /> between the southernmost row of buildings and the middle row of buildings, Also, 10 <br /> feet of space is provided in a north-south orientation between the same two sets of <br /> buildings. Planning Staff submitted that,as shown, these features do not meet the • <br /> requirement for a five-foot wide exterior pedestrian circulation system that does not <br /> delineate this circulation system, and either the design must be modified or the Applicant <br /> must request and be granted an administratively reviewed modification from this <br /> standards under EMC 19.09.100.A(3). The site's internal pedestrian walkway would be <br /> required to connect to the site's frontage improvements. Exhibits 1 and 3, Sheet C 3.0. <br /> 14. The Applicant submitted a traffic analysis prepared by qualified professionals. The <br /> analysis considered the trips assigned to the former uses of the site(one single-family <br /> unit and one 1,984 square foot commercial use)and the proposed 25 low rise multifamily <br /> units and applied trip generation rates from the Institute of Transportation Engineers' <br /> (ITE)Trip Generation Manual (10th Edition,2017). The subdivision is projected to <br /> generate 125 new average daily trips including eight new PM peak hour trips. Because <br /> this number is below the City's threshold for requiring further study(which is 50 PM <br /> peak hour trips),no additional traffic study was required to review operations at specific <br /> intersections,etc. The Applicant's traffic analysis noted that the posted speed limit on <br /> Mukilteo Boulevard is 35 MPH and that there is 450 feet of sight distance in both <br /> directions at the location of the proposed site entrance. The City requires payment of <br /> traffic impact mitigation fees based on PM peak hour trips. The current fee is$3,994; <br /> however, the project would be assessed the fee in effect at time of building permit <br /> application. Exhibits 1 and 20; Michael Brick Testimony. <br /> 15. The initial decision reviewed the required building heights as stated in EMC 19.22.150 <br /> Map 22-1,which as available online appeared to show the subject property is in an area <br /> with a maximum structure height of 28 feet. This conflicted with the information in the <br /> staff report, in which staff report called out the maximum height allowed on site pursuant <br /> to as three floors. In response to the Applicant's request for reconsideration, Planning <br /> Staff submitted a screen shot zoomed in on the subject property(with addresses visible <br /> along Mukilteo Boulevard,which clearly shows that the NB zoned subject property, <br /> adjacent parcel at 3718, and the NB-zoned properties across the street to the north are <br /> subject to a three-floor maximum height limit. Note,according to a May 21,2021 <br /> Planning Director Interpretation(PDI 2021-1), in the NB zone where new public or <br /> private streets are proposed,building heights are calculated from the average elevation of <br /> the centerline of the street proposed to abut the principal frontage of the building,or from <br /> the average elevation of the centerline of the public or private street perpendicular to the <br /> midpoint of the building's principal facade. EMC 19.22.150 Map 22-1; Exhibits 2, 35, <br /> 38, and 39. <br /> 16. All proposed lots would connect to municipal sewer and water utilities consistent with <br /> the requirements in EMC Titles 14 and 16. Existing water and sewer mains in W. <br /> Mukilteo Boulevard would be extended into and through the site to connect to all lots. <br /> The City indicated that both utilities have capacity to serve the proposed subdivision. <br /> Everett Hearing Examiner <br /> Findings, Conclusions, and Decision <br /> Sage Homes Northwest LLC(REVII22-001) page 7 of22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.