Laserfiche WebLink
Structural: <br /> 1. Please provide an appropriate typical stud spacing and nailing pattern for the 2x4 stud walls per <br /> the provisions of the 2018 AWC NDS or a reference to a tabulated prescriptive wall composition <br /> from the 2018 WRC. <br /> 2. The 2018 WBC and 2018 WRC require a complete load path from roof to foundation to soil. Please <br /> ensure that the new walls are connected to the existing foundation by providing and indicating <br /> on plan the anchorage required to secure the sill plate to the foundation. <br /> In order for the processing of your application to continue, it will be necessary to provide the Building <br /> Division with two new sets of revised construction documents reflecting the corrections requested. <br /> Please include a response letter which indicates how the corrections were resolved. <br /> These initial comments are general in nature and based on preliminary information. Additional <br /> comments will typically be generated once a complete submission is reviewed. All comments are based <br /> on the 2018 International Building Code (IBC), 2018 International Residential Code (IRC), and/or the <br /> 2018 Washington State Residential Energy Code (WSEC), as amended by the State of Washington and <br /> adopted by the City of Everett. <br /> These comments address building issues only. Additional revisions or additions may be required by other <br /> departments(such as Utilities,Traffic,Planning or Fire). All required submittals must be of sufficient detail <br /> and information to ensure that the proposed structure will be constructed in compliance with all adopted <br /> codes. <br /> Sincerely, <br /> Benjamin Monk, PE <br /> Building Plans Reviewer I City of Everett Public Works <br /> 3200 Cedar Street © 425.257.8810 rhammer@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov <br />