Laserfiche WebLink
7 of 22 <br /> PROJECT NO. NO. <br /> S231120-2XR <br /> PROJECT 1711 England Ave Everett WA 98203 <br /> LONGITUDE SUBJECT Foundation Stabilization/Jacking <br /> ONE TWENTY0 <br /> ENGINEERING&DESIGN BY JT DATE 12/19/2023 <br /> Ideal Foundation Systems 2-7/8"0 Helical Pile(0.203-inch wall thickness)-Soil capacity per ESR-3750 <br /> DIGGA 6K Crive-leac Torque Correlation Factor, Uzimate axial Compressive Allowable Axial Compressive <br /> Pressure Torque, T K. Capacity Capacity <br /> (psi) (fr•Itrs) Compression,of t J P.=Kc'T,(kips) P. =0.5'P.,(kips) <br /> 500 1,554 9 14-0 7.0 <br /> S00 1,865 9 16.8 8.4 <br /> 700 2,176 9 19.6 9.8 <br /> 800 2,486 9 22.4 11.2 <br /> 900 2,797 9 25 2 12.6 <br /> 1000 3,108 9 28.0 14.0 <br /> 1100 3,419 9 30.8 15.4 <br /> 1200 3,730 9 33.6 16.8 <br /> 1300 4,D40 9 _ 36.4 18.2 <br /> 1400 4,351 9 39.2 19.6 <br /> 1500 <br /> 4,662 9 42.0 21.0 <br /> 160O 4,973 9 44.8 22.4 <br /> 17D0 5,284 9 47.6 23.8 <br /> 18DO 5,594 9 50.3 25.2 <br /> 19 DO 5,905 9 53.1 26.6 <br /> 2000 6,216 9 55.9 28.0 <br /> MAX 1 2100 6,527 9 58.7 29.4 <br /> i.)DIGGA 6K Drive Head differential pressure display to torque output has been pulled from the attached conversion charts provided by DIGGA. <br /> ii.)Per Table 5A of ESR-3750,the maximum installation torque rating of a 2-7/8"0 helical pile(0.203-inch wall thickness)is 8,300 ft'Ibs.Per Ideal <br /> Manufacturing,Inc.,the maximum installation torque rating of a 2-7/8"0 helical pile 10.203-inch wall thickness)is 8,000 ft•lbs_Final installation <br /> torque shall not exceed the lesser of these limiting values. <br /> iii.)Piles shall reach a torque that correlates with an allowable capacity that meets or exceeds the maximum allowable load demand as listed in the <br /> structural package,but shall not exceed the maximum allowable capacity for any part ofthe pile assembly. <br /> iv.)Refer to ESR-3750 and idea[ManV,acturng,Inc. documents for additional information and requirements. <br /> v.)Definitions per ESR-3750: <br /> T=Final Installation torque in ft'Ibs;the last torque reading taken during pile installation,using,for example,the <br /> torque reading instruments connected to the installation equipmen, <br /> Kt Torque correlation factor per ESR-3750 <br /> P,=Ultimate axial compressive capacity(in kips)of helical pile <br /> P,=Allowable axial compressive capacity(in kips)of helical pile <br /> vi.1 For torque readings between those listed,use the following equation to determine the allowable capacity:P._(T•KJ/2 <br /> vii.+1 kip=1,000 lbs <br /> L120 ENGINEERING&DESIGN <br />