My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1605 SE EVERETT MALL WAY WALMART 2025-09-10
>
Address Records
>
SE EVERETT MALL WAY
>
1605
>
WALMART
>
1605 SE EVERETT MALL WAY WALMART 2025-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 2:48:40 PM
Creation date
8/21/2025 12:35:01 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1605
Tenant Name
WALMART
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Fire Sprinklers System (NFPA-13 & 13R) <br /> EVERETT EVERETT Acceptance Test Checklist <br /> WASHINGTON INFORMATION HANDOUT C-6 4.13.2020 <br /> General <br /> This document's intent is to provide contractors with guidelines outlining the expectations and <br /> procedures for how the Everett Fire Marshal's Office will conduct an acceptance test of a fire sprinkler <br /> system.This document addresses the most common aspects of a fire sprinkler acceptance tests, in cases <br /> where this document does not address a device or operation used with your system IFC, NFPA, and/or <br /> Manufacturer Specifications will be used to determine testing criteria. <br /> Underground/Flush PASS FAIL N/A <br /> 1. Approved Plans-An Approved/Stamped set of plans shall be located at the job El El El <br /> site. <br /> 2. Responsibility- Underground supply will be broken into two categories: <br /> • First will be everything before and up to the approved double check <br /> detector assembly which is the responsibility of the Everett Utilities <br /> Department to witness and inspect. <br /> • Second is everything after the approved double check detector assembly <br /> to the fire sprinkler riser which is the responsibility of the Everett Fire <br /> Department to witness and inspect. <br /> 3. NFPA 24 Report-The contractor shall complete, sign, and provided a copy of the El El El <br /> contractor's material and test certificate to the AHJ. (NFPA 24 Figure 10.10.1.) <br /> Hydrostatic Test: <br /> PASS FAIL N/A <br /> 4. Schedule Inspection -The contractor shall schedule for the inspection using El El El <br /> eTRAKiT online permitting portal. Inspection requests submitted online before <br /> 11:59 p.m. on Monday-Friday will be tentatively scheduled for the next business <br /> day. <br /> 5. 2 Hour Test-A member of the Fire Marshal's Office will contact the contractor to El El El <br /> schedule a time for the inspection.The contractor is responsible for verifying that <br /> all piping and attached equipment to the system subjected to system working <br /> pressure has been under 200 psi of pressure or 50 psi in excess of the system <br /> working pressure,whichever is greater, and shall maintain the pressure at+-5 psi <br /> for 2 hours prior to the inspection. Example:Timestamped photograph of pressure <br /> gauge. (Loss shall be determined by a drop in the gauge pressure or visual <br /> leakage.) <br /> Fire Marshal's Office I 425.257.8100 everettwa.gov/fire <br />
The URL can be used to link to this page
Your browser does not support the video tag.