My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1605 SE EVERETT MALL WAY WALMART 2025-09-10
>
Address Records
>
SE EVERETT MALL WAY
>
1605
>
WALMART
>
1605 SE EVERETT MALL WAY WALMART 2025-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 2:48:40 PM
Creation date
8/21/2025 12:35:01 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1605
Tenant Name
WALMART
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Backfill -The trench shall be backfilled between joints before testing to prevent El El El <br /> movement of pipe.Thrust blocks and or restrained joint systems shall also be left <br /> uncovered for inspection. <br /> 7. Joints-Joints shall be inspected for visual leakage El El El <br /> 8. Thrust Blocks-Thrust blocks shall be installed as per approved set of plans and El El El <br /> placed between undisturbed earth and the fitting to be restrained and shall be <br /> capable of resisting the calculated thrust forces. Wherever possible,thrust blocks <br /> shall be placed so that the joints are accessible for repair. <br /> 9. Release Pressure-After verifying that the system has maintained the required 200 El El El <br /> psi for 2 hours, release pressure from the system to verify that the gauge is <br /> operating properly. <br /> Flushing: <br /> PASS FAIL N/A <br /> 10. Before Connection- Underground piping,from the water supply to the system El El El <br /> riser, and lead-in connections to the system riser shall be completely flushed <br /> before the connection is made to downstream fire protection system piping. <br /> 11. Pre-Flushing- Pre-flushing shall be conducted by the contractor to ensure all El El El <br /> foreign materials have been flushed from the system prior to the fire inspector <br /> conducting the official flush test. <br /> 12. Flushing Operations- Flushing operations shall be set-up and conducted El El El <br /> complying with the following: <br /> • The discharge used for the flush shall be located in close proximity of the <br /> lead-in connection to the system riser. <br /> • Water shall be discharged through an open ended 4-inch pipe or through <br /> a 4-inch pipe connected to a Y or siamese connection with two 2% inch <br /> hoses. <br /> • There shall be two burlap bags connected to each outlet. <br /> • Flow rate shall be at a minimum of 390 gpm. <br /> • See the examples 1,2, and 3 of the acceptable configurations for flushing <br /> of the system <br /> 13. 10-Minute Cycles-The fire inspector will conduct the flush test in 10-minute El El El <br /> cycles, after each cycle the inspector will inspect the burlap bags located at the <br /> outlets for foreign materials.These cycles will continue until water is clear and the <br /> bags are free of all foreign materials. Note:After two cycles, if significant <br /> materials are still present in the bags the inspector will reschedule the remainder <br /> of the test for a different time to allow for the contractor to continue pre flushing <br /> the system. <br /> Fire Marshal's Office 425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT C-6 4.13.2020 I Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.