PICKUP REFRIGERATION SHEET NOTES SHEET NOTES DEMOLITION REQUIREMENTS <br /> EQUIPMENT SALVAGE <br /> REQUIREMENTS REFER TO SHEET R1 FOR ALL NOTES PERTAINING TO 1. SALES FLOOR TO BE ACCESSIBLE TO <br /> THIS SHEET. CUSTOMERS DURING NON-CONSTRUCTION 1. ALL DEMOLITION SHALL CARRIED OUT A <br /> HOURS.PROVIDE TEMPORARY COVERS CAPABLE SAFE MANNER AND IN STRICT ACCORDANCE <br /> DO NOT INCLUDE SALVAGE CREDIT FOR O E WITH OSHA REGULATIONS <br /> REFRIGERATION EQUIPMENT IN THIS PROJECT BID. OF WITHSTANDING SHOPPING CART TRAFFIC <br /> EPA CLEAN AIR ACT AND OCCUPANTS FOR PITS AND TUNNELS, 2. THE CONTRACTOR SHALL FIELD VERIFY THE <br /> RECOVER ALL REFRIGERANT FROM THE EXISTING REMOVE CONSTRUCTION FENCING AND DUST EXTENT OF DEMOLITION.THE WORK INCLUDES, <br /> REFRIGERATION EQUIPMENT TO BE REMOVED. WALLS INTERFERING WITH CUSTOMER BUT IS NOT LIMITED TO,THE DEMOLITION AND <br /> RECOVERED REFRIGERANT SHALL BE USED TO CHARGE NEW COMPLY WITH CLEAN AIR ACT,TITLE VI,SECTION 608 CIRCULATION OR ACCESS. REMOVAL OF REFRIGERATION EQUIPMENT, <br /> REFRIGERATION EQUIPMENT OR SHALL BE STORED IN AND CODE OF FEDERAL REGULATION TITLE 40,PART 82 2. REMOVE WALL STANDARDS ABOVE 96"AFF. REFRIGERATION LINES,AND ELECTRICAL ITEMS <br /> REFRIGERANT CYLINDERS.RECOVERED REFRIGERANT WHEN ADDING OR REMOVING REFRIGERATED 3. DEMOLITION INCLUDES BUT IS NOT LIMITED TO INCLUDING CONDUITS AS SHOWN ON DRAWING <br /> SHALL BE PLACED IN REFRIGERATION RACK HOUSE AND EQUIPMENT.RECORD ALL EQUIPMENT IDENTIFICATION ITEMS SHOWN DASHED.REF DEMOLITION OR AS REQUIRED FOR THE INSTALLATION OF <br /> CLEARLY LABELED AND DATED FOR FUTURE USE. NUMBERS,MODEL AND SERIAL NUMBERS,THE AMOUNT REQUIREMENT NOTE ON N1 SHEET. NEW WORK FOR A COMPLETE JOB. <br /> OF REFRIGERANT RECOVERED FROM EACH UNIT,THE 4. REMOVE ALL DOORS SHOWN DASHED.REFER TO <br /> CAREFULLY DOCUMENT THE AMOUNTS OF REFRIGERANT DATE OF DECOMMISSIONING,COMPANY NAME AND ENLARGED PLANS AND DOOR SCHEDULE FOR 3. WHEN UTILITIES ARE REMOVED,CAP AND <br /> REMOVED FROM DEMOLISHED EQUIPMENT IN ACCORDANCE SIGNATURE OF ON-SITE SUPERVISOR. „ DOOR AND FRAME REPLACEMENT. SEAL A MINIMUM OF 8"BELOW FINISH FLOOR <br /> WITH WALMART'S POLICIES AND APPLICABLE LAWS,CODES, : 5. REMOVE CARPET AND GLUE FROM COLUMNS. OR A MINIMUM OF 6"ABOVE FINISHED <br /> AND REGULATIONS FOR REFRIGERANT RECOVERY AND ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A PATH AND REPAIR COLUMNS TO SMOOTH CEILING.SHOW ALL ABANDONED AND CAPPED <br /> HANDLING. WALMART APPROVED CONTRACTOR. SURFACE PRIOR TO PAINTING. <br /> 6. COORDINATE REMOVAL AND DISPOSAL OF UTILITIES ON AS-BUILTS,DRAWINGS,AND F <br /> OGP EQUIPMENT TO BE REMOVED WILL BE PREPARED AND EXISTING REFRIGERATED CASES AND FIXTURES RECORDED DOCUMENTS. w gg <br /> SALES ON TO CONSTRUCTION. <br /> ACCESSIBLE TO CUSTOMERS ;�$?i!a <br /> PALLETIZED FOR SALVAGE BY THE GENERAL CONTRACTOR DURING CONSTRUCTION. WITH MECHANICAL SERVICES CONSTRUCTION 4, IT IS THE CONTRACTOR'S RESPONSIBILITY TO w . <br /> AND WILL BE SALVAGED BY OWNER'S DESIGNATED SALVAGE MANAGER. brow LLai;aoam <br /> VENDOR IN ACCORDANCE WITH PROJECT SPECIFICATIONS. PROVIDE ADEQUATE SHORING,BRACING,AND <br /> DEMOLITION INCLUDES BUT NOT LIMITED TO ITEMS a 5II%z W <br /> SUPPORT SYSTEMS TO KEEP THE EXISTING 0 f ro <br /> SHOWN DASHED. STRUCTURE INTACT AND IN A SAFE a.=a W'a <br /> CONDITION DURING THE REMOVAL OF O 3«:�^=oz.zq:°z�: <br /> COORDINATE PROJECT SCOPE OF WORK,SCHEDULE r �"��rc w-;�:p o°:a <br /> DEMOLITION LEGEND STRUCTURAL ITEMS AND NEW CONSTRUCTION.;og Eh�o <br /> AND PHASING WITH CONCURRENT WALMART REMODEL g w h o 3 oyk wo PROJECT AND WALMART MECHANICAL CONSTRUCTION 5. THE CONTRACTOR SHALL RETAIN A n a <br /> MANAGER. REGISTERED PROFESSIONAL ENGINEER TO <br /> EXISTING TO REMAIN DESIGN THE SHORING AND SPECIFY <br /> REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED DEMOLITION PROCEDURES. <br /> FOR DEMO OR REPLACEMENT,INCLUDING(BUT NOT DEMOLISH/REMOVE <br /> LIMITED TO):REFRIGERATED CASES,WALK-IN COILS, 6. IT IS THE CONTRACTOR'S RESPONSIBILITY <br /> ASSOCIATED VALVES,REFRIGERATION AND AREA TO BE DEMOLISHED FOR MEANS AND METHODS OF DEMOLITION <br /> CONDENSATE PIPING,HANGERS AND SUPPORTS,AND AND NEW CONSTRUCTION.PRIOR TO THE t9 y <br /> CONTROLS NOT BEING REUSED.COORDINATE DISPOSAL —--— RELOCATE EXCAVATION OF FOUNDATIONS ADJACENT TO z <br /> OF EQUIPMENT WITH CONSTRUCTION MANAGER.PATCH —' a <br /> PENETRATIONS TO MATCH EXISTING.REFER TO THE EXISTING STRUCTURE,PROVIDE M a <br /> ARCHITECTURAL DRAWINGS. ADEQUATE SUPPORT FOR THE SUB-BASE TO I Iwy m=a <br /> PREVENT UNDERMINING. ■` z S=m <br /> F <br /> 7. DURING DEMOLITION AND RECONSTRUCTION, I z i <br /> THE CONTRACTOR SHALL COORDINATE WITH <br /> THE WALMART CONSTRUCTION MANAGER ANY n [] <br /> REQUIRED SAFETY BARRIERS OR BARRICADES. z " a <br /> REFER TO THE WALMART CONSTRUCTION O <br /> U <br /> MANAGER FOR PHASING AND SCHEDULING <br /> DEMOLITION AND NEW CONSTRUCTION. <br /> 8. CONDUCT ALL DEMOLITION AND REMOVAL OF <br /> DEBRIS AS REQUIRED TO INSURE MINIMUM <br /> INTERFERENCE WITH BUKLDIN/SITE FACILITIES <br /> AND OPERATIONS.REFERENCE SALVAGE <br /> REQUIREMENTS. 0 z <br /> O C� 0 <br /> 9. NOTES INDICATING DEMOLITION WORK ARE O O 0 Q <br /> NOT CONFINED SOLELY TO THE DEMOLITION �rr�� <br /> PLANS.THE GENERAL CONTRACTOR SHALL V 2� <br /> REVIEW ALL CONSTRUCTION DOCUMENTS. Z J <br /> INCLUSIVE OF SCHEDULES AND <br /> SPECIFICATIONS,TO DETERMINE FULL EXTENT <br /> OF DEMOLITION WORK. Q <br /> �I�UJI W z o <br /> SALVAGE REQUIREMENTS W o N <br /> 0 WLU <br /> IMMEDIATE SALVAGE/LEGAL DISPOSAL OF ALL W c5 <br /> DECOMMISSIONED EQUIPMENT AND CONSTRUCTION J w <br /> DEBRIS SHALL BE THE RESPONSIBILITY OF THE <br /> CONTRACTOR.THE GENERAL CONTRACTOR WILL > w <br /> COORDINATE DISPOSAL OF OTHER MATERIALS WITH W <br /> AES AND/OR WASTE MANAGEMENT. <br /> z <br /> RECLAIMED REFRIGERANT WILL REMAIN IN THE <br /> POSSESSION OF WALMART STORES,INC.ON <br /> APPLICABLE PROJECTS INVOLVING GAS <br /> CONVERSION.THE CONTRACTOR SHALL ASSIST <br /> WALMART IN THE SCHEDULING OF APPROPRIATE ISSUE BLOCK <br /> CYLINDERS FOR THE COLLECTION OF <br /> REFRIGERANTS,WHICH WALMART WILL PROCESS <br /> THROUGH THEIR VENDOR RECLAMATION PROGRAM, <br /> OR USE IN OTHER WALMART EQUIPMENT,AT THE <br /> DISCRETION OF THE WALMART CONSTRUCTION <br /> MANAGER.THE CONTRACTOR AND WALMART <br /> CONSTRUCTION MANAGER MUST RECORD THE <br /> USAGE OR DECOMMISSIONING OF THE <br /> REFRIGERANT LOGS AT THE COMPRESSOR RACKS. <br /> INSTALLING CONTRACTOR WILL REMOVE AXP <br /> DEVICES MOUNTED ON WALK-IN BOXES PRIOR TO <br /> THE BOX DEMO AND HANDOVER TO STORE <br /> MANAGEMENT FOR SAFE STORAGE OF EQUIPMENT. <br /> GENERAL CONTRACTOR WILL PROVIDE NEW <br /> CONDUIT IN THE SAME LOCATION ON THE NEW <br /> WALK-IN BOXES.INSTALLING CONTRACTOR WILL <br /> • NOTIFY CTS OF EQUIPMENT/CABLE RE-INSTALL <br /> DATE.CTS WILL ARRANGE FOR CABLING <br /> CONTRACTOR TO RUN WIRE AND RE-INSTALL AXP <br /> DEVICES. <br /> SALVAGE OF WALK-IN PANELS AND WALK-IN <br /> DOORS WILL BE THE RESPONSIBILITY OF THE <br /> PANEL MANUFACTURER. <br /> CHECKED BY: DL <br /> NOTICE:THESE SALVAGE REQUIREMENTS DO NOT <br /> 12 13 14 INCLUDE HVAC EQUIPMENT,RACKHOUSES DRAWN BY: GM <br /> CONDENSERS,REMOTE CONDENSING UNITS, <br /> COOLING TOWERS AND FLUID COOLER PROTO: 90 <br /> REPLACEMENTS. <br /> PROTO CYCLE: 11/11/22 <br /> ROLE OF WASTE MANAGEMENT: <br /> DOCUMENT DATE: 02/22/23 <br /> DELIVER CONTAINERS BASED ON DELIVERY <br /> — DATES PROVIDED BY THE GENERAL <br /> CONTRACTOR. <br /> E — — — — — — — SERVICE FOR THE CONTAINERS AS REQUESTED. <br /> SUPPORT PERSONAL AT ALL TIMES DURING <br /> THE PROJECT <br /> THE END OF FOR SERVICES THAT OCCUR AT <br /> THE END OF THE PROJECT. <br /> ROLE OF GENERAL CONTRACTOR(GC): <br /> CONTACT WASTE MANAGEMENT 72 HOURS <br /> PRIOR TO PROJECT LAUNCH TO HAVE <br /> ESTABLISHED SERVICES DELIVERED. <br /> I —— —— WASTE MANAGEMENT C8D TEAM <br /> q M I 1-866-338-2342 OR OAKLEAFCDTEAM@WM.COM <br /> e f h`a BERNICE MURPHY 1-860-268-6317 OR <br /> COM <br /> MICHAEL LASSONDE 1�60-268-6317 OR <br /> d �l/�l/�1/Tl �_ i�u��_� �_�__�_� J MLASSONDE@WM.COM <br /> ® P ——— - ESTABLISHED SERVICES WILL BE DETERMINED <br /> III HI I FROM THE PROJECT ESTIMATION FORM FILLED <br /> - —_---A — " ---_--- --.--J OUT BY THE EOR. <br /> _ REQUEST ALL NEEDS FOR CONTAINERS FOR <br /> J SERVICE VIA PHONE OR EMAIL TO WM'S <br /> REMOVE AND SALVAGE REFRIGERATED NATIONAL ACCOUNTS OFFICE. <br /> F I PICKUP CASES ACCORDING TO PICKUP <br /> 444 \\ MTC-05 v REFRIGERATION EQUIPMENT SALVAGE <br /> \ \ REQUIREMENTS NOTE <br /> Q A 12' SCHV-30C A <br /> \� \\.� (DEMO) III _ GC TO PREPARE AND PALLETIZE <br /> Q \ REFRIGERATION EQUIPMENT FOR Additional Permits Are Required <br /> SHIPMENT AND COORDINATE For This Project To Include: <br /> — \ REMOVAL WITH THIRD PARTY ) DOCUMENTS THAT DO NOT <br /> VENDOR,REF SPECIFICATIONS HAVE THE ARCHITECT OR <br /> \\• DEMO HOT CASE L J O Plumbing Sprinkler ,` City of Everett Permit Review <br /> ENGLANDSIFRECORD <br /> — — — — — — Mechanical EVERETT$tBtUS:Reviewed for Permit SEAL AND SIGNATURE <br /> \ ❑ Fire Alarm "" SHALL BE CONSIDERED <br /> jX Electrical 08/31/2023 1:50:14 PM NOT FOR CONSTRUCTION <br /> REFRIGERATION DEMO PLAN <br /> D FRONT REFRIGERATION DEMO PLAN REAR REFRIGERATION DEMO PLAN <br /> 1 <br /> EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br /> ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br /> EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE <br /> SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES <br /> PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING <br /> SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: <br /> DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF R D 1 <br /> EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO <br /> FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. <br />